How to Obtain a Certificate of Occupancy for a
Single Family Residential Structure

The processing of a certificate of occupancy shall follow the guidelines as stated below according to the Standard Building Code:

Upon satisfactory completion of construction of a building or structure and installation of electrical, gas, mechanical, and plumbing systems in accordance with the technical codes, reviewed plans and specifications and after the final inspection, the Building Official shall issue a Certificate of Occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and the allowable load per square foot for each floor accordance with the provisions of this code.

The following inspections must be performed and approved. To obtain the following inspections you may request an inspection by using our voice response system at 404-730-5858 or you may retain a private engineer. (Please allow 48 hours response time for all requests.)

Building

Electrical

Plumbing

Mechanical

*Footing (see below)

Rough

Slab

Rough

Framing

Final

Rough

Final

Final

 

Sewer

 
   

Final

 

*Footing: You must retain a private engineer to perform this inspection.
Click here for a list of qualified engineers
.

Advisory: All holds must be released and all fees paid prior to issuance of a certificate of occupancy. You should call (770) 551-7721 or (770) 306-3036 10 days in advance to determine release of holds.

You are required by Fulton County regulations to obtain a certificate of occupancy prior to occupancy of the premises, including furniture. It is incumbent upon you as the owner and/or contractor to obtain an approval on all required inspections.

NOTE: Response times listed are minimum allowable times and are subject to change depending on work volume in the Department.