DEPARTMENT OF SINGLE FAMILY RESIDENTIAL |
||||||||||||||||||||||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
DATE: ____________________________TO: _______________________________FROM: ___________________________LOT ADDRESS : ________________PERMIT NUMBER: ___________________LOT NUMBER: _________________SUBDIVISON: ________________________This is to inform you that the final inspection for compliance with the specifications of the Fulton County Soil Erosion and Sedimentation Control Ordinance has been APPROVED OR REJECTED as indicated below by the Department of Environment and Community Development. INSPECTION ITEMS
_________________________________ Environment & Community Development Inspector A detailed description of the standards for each inspection item follows: |
|||||||||||||||||||||||||||||||||||||||||||||||||||||
|
FULTON
COUNTY |
||||||||||||||||||||||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
EFFECTIVE APRIL 1, 2004 , ALL BUILDING PERMITS WILL BE ISSUED WITH A CONDITIONAL FINAL INSPECTION REQUIREMENT, THERFORE, NO CERTIFICATES OF OCCUPANCY WILL BE ISSUED UNLESS THIS CONDITION IS SATISFIED |
|||||||||||||||||||||||||||||||||
GENERAL |
|
||||||||||||||||||||||||||||||||
ADDRESS |
Any building that is not visible from the roadway must have address posted at the street. Buildings which are 50 feet or less from the edge of the roadway require the following:
|
||||||||||||||||||||||||||||||||
BUFFER INTACT |
|
||||||||||||||||||||||||||||||||
The blue line tributary distinction is as depicted on USGS Quadrangle Maps. Any encroachment into a stream buffer area should be reported to Blake Dettwiler (404)-730-8733, or Gene Callaway (404)-730-7531. Detention Ponds : All detention facilities should have the following.
Tree Save Areas & Specimen Trees : Verify that all tree save fence has been removed and any/all tree save areas and specimen trees are located on the applicable lot. |
|||||||||||||||||||||||||||||||||
DRAINAGE |
Natural Drainage Features (existing) :
It is unacceptable to render any existing drainage way less suitable to accept and transport storm water that has historically flowed through such drainage way. Drainage Easements : The following are the responsibility of the owner, person, firm, corporation or other entity:
Drainage System Connection : Permission is required from the County to:
Permission shall be implied as part of an approved stormwater management plan from the County. Deviations from the approved stormwater management plan, that do not have permission from the County, shall be deemed an illicit connection and in violation of the Stormwater Management Ordinance. Drainage Adjacent to Structures : All lots are required to be graded so as to:
|
||||||||||||||||||||||||||||||||
CURB & GUTTER, SIDE WALK and DRIVEWAY
|
|
||||||||||||||||||||||||||||||||
SEDIMENT BARRIERS |
|
||||||||||||||||||||||||||||||||
STABILIZATION |
|
||||||||||||||||||||||||||||||||
SLOPE STABILITY |
All slopes greater than 2:1 shall be stabilized structurally, or through a combination of matting and vegetative measures at the time of final inspection. |
||||||||||||||||||||||||||||||||
SEWER CLEANOUT |
Sewer cleanouts are required to be:
Cleanouts in drives are to be fitted with a “traffic grade” fixture. |
||||||||||||||||||||||||||||||||
RETAINING WALLS |
Retaining wall permits must be provided for verification at the time of final inspection. |
||||||||||||||||||||||||||||||||
Where applicable, the posting of a bond may be accepted in lieu of completing outstanding items in the final inspection. The bond may be in the form of cashiers check made payable to Fulton County Government or an escrow account. Multiple bonds may be posted for multiple building permits at the issuance of the permits. All bonds should submitted to Leslie Campbell at the Fulton County Government Center located at 141 Pryor Street, Suite 2085, Atlanta/404-730-8033. The bond amounts are calculated as follows; Final stabilization and the removal of sediment barriers:
Curb & Gutter Repair......... $700.00 Side Walk Repair................$700.00 Driveway Repair...............$1,000.00 |
|||||||||||||||||||||||||||||||||
STEPS TO AQUIRE AN SFR FINAL SIGN-OFF
|
|||||||||||||||||||||||||||||||||