PETITION No.2003Z-0160 NFC

2003VC-0226 NFC


 

PROPOSED ZONING                     O-I (OFFICE-INSTITUTIONAL) - 16,304.4 SQUARE       FEET PER ACRE

 

PROPOSED USE                               OFFICE BUILDING – 15,000 SQUARE FEET

 

EXISTING ZONING                           R-3 (RESIDENTIAL)

 

EXISTING USE                                    SINGLE FAMILY RESIDENCE

 

LAND USE MAP                                  OFFICE

 

LOCATION                                              BEACHLAND DRIVE (NORTH SIDE):

                                                                        219.3 FEET OF FRONTAGE

 

ROSWELL ROAD (EAST SIDE):

                                                                        212.42 FEET OF FRONTAGE

 

                                                                        PARCEL SIZE .92 ACRE

 

                                                                        SMALL AREA 433

 

                                                                        LL 92, DISTRICT 17

 

                                                                        COMMISSION DISTRICT 4

                                                                       

OWNER                                                    SHARON MCSWAIN HOMES

 

PETITIONER                                         SHARON MCSWAIN HOMES

 

REPRESENTATIVE                          BILL AGUILAR


APPLICANT'S INTENT             The applicant intends to develop an office building

                                                                        with 15,000 square feet at a density of 16,304.4

                                                                        square feet per acre.  In addition, the applicant is

                                                                        requesting the following 2-part concurrent

                                                                        variance:

 

                                                                        Part 1 – Delete the 10-foot improvement setback along the east property line (Article 4.23.1);*

 

                                                                        Part 2 – Reduce the required number of parking

                                                                        spaces from 45 spaces to 39 spaces (Article

                                                                        18.2.1).*

 


 

Department of Environment and Community Development

Recommendation

 

APPROVAL CONDITIONAL: 2003Z-0160 NFC – 10,869.57 SQUARE FEET PER ACRE WITH A TOTAL OF

10,000 SQUARE FEET

DENIAL:  2003VC-0226 (PART 1)

DENIAL: 2003VC-0226 (PART 2)

 

 

Community Zoning Board Recommendation

November 18, 2003

 

DENIAL:  2003Z-0160 NFC

DENIAL:  2003VC-0226 (ALL PARTS )


 

Board of Commissioners

December 3, 2003

 

DEFERRAL – 90 DAYS

 

 

Board of Commissioners

March 3, 2004

 

DEFERRAL – 30 DAYS

 


            SUBJECT SITE AND SURROUNDING AREA:

 

            SUBJECT SITE:  The .92-acre subject site is currently undeveloped and zoned R-3

            (Residential).  The subject site is located in Sandy Springs Urban Overlay District. 

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: NON-RESIDENTIAL

 

**         North - Use: Maxim Cabaret (Existing)

            Petition: Z74-077 NFC and Z78-094 NFC

            Zone: C-1 (Community Business)

            Density: Not Stated

            Height: Maximum of 45 feet

 

**         Further North - Use: Belini (Existing)

            Petition: Z93-044 NFC

            Zone: C-1 (Community Business)

            Density: 12,122 square feet per acre

            Height: 1 story

 

**         Further North - Use: Sandalon East Retail and Office Space (Existing)

            Petition: Z71-055 NFC

            Zone: C-1 (Community Business)

            Density: 15,955 square feet per acre

            Height: 2 stories

 

**         Further North – Use: Plaza Jewelers (Existing)

            Petition: Z83-039 NFC

            Zone: C-1 (Community Business)

            Density: 2,108 square feet per acre

 

**         South – Use: Harry Norman Realty (Existing)

            Petition: Z73-157 NFC

            Zone: C-1 (Community Business)

            Density: Not Stated

 

**         Further South – Use: Office Space (Existing)

            Petition: Z77-039 NFC

            Zone: O-I (Office Institutional)

            Density: Not Stated

 

**         Further South – Use: Dance Studio (Existing)

            Petition: Z98-043 NFC

            Zone: O-I (Office Institutional)

            Density: 9,279.66 square feet per acre

 

**         Further Southwest – Use: Office Space (Existing)

            Petition: Z88-133 NFC

            Zone: C-1 (Community Business)

            Density: Not Stated

 

**         Further Southwest – Use: AJC International (Existing)

            Petition: Z79-102 NFC

            Zone: O-I (Office Institutional)

            Density: 8,649 square feet per acre

 

**         Further Southwest – Use: 5180 Roswell Road Offices (Existing)

            Petition: Z80-084 NFC

            Zone: O-I (Office Institutional)

            Density: 8,000 square feet

 

**         West – Use: Office Space (Existing)

            Petition: Z83-009 NFC

            Zone: O-I (Office Institutional)

            Density: 10,374 square feet per acre

            Height: 2 stories

 

**         Northwest – Use: Mt. Paran Walk Shopping Center (Existing)

            Petition: Z87-015 NFC

            Zone: C-1 (Community Business)

            Density: 9,353 square feet per acre

 

**         Further Northwest – Use: Chevron (Existing)

            Petition: Z68-038 NFC

            Zone: C-1 (Community Business)

 

**         Further Northwest – Apartment Building (Existing)

            Petition: Z63-018 NFC

            Zone: A-L (Apartment Limited)

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: RESIDENTIAL

 

**         East, Southeast and Further East - Use: Residential Subdivision (Existing)

            Petition: No Petition

            Zone: R-3 (Residential)

 

**         There have been no RECENT DENIALS and there are no MISCELLANEOUS USES/ZONINGS in the immediate area.

 

SITE PLAN ANALYSIS:

 

Based on the applicant's revised site plan submitted to the Department of Environment and Community Development on November 21, 2003, Staff offers the following considerations:*

 

LAND USE AND DENSITY

 

The applicant is proposing to develop an office building with 15,000 square feet at a density of 16,304.4 square feet per acre.  The proposed office use is consistent with the Comprehensive Plan Land Use Map's suggestion of office development and is consistent with the surrounding land uses as well.  Commercial development such as Maxim Cabaret and Belini's are located north of the subject site, and office development is located south and west of the site.  However, the requested density is not consistent with the existing office development in the immediate vicinity.   Pursuant to Z83-009 NFC, the Board approved an office development with a density of 10,374 square feet per acre.  This office development is located west of the site and across Roswell Road and represents the highest office density approved by the Board in the immediate area.

 

In Staff's opinion, the proposed office development is consistent with existing development in the area and planning policies, if developed at a density consistent with office development in the area.   Staff recommends APPROVAL CONDITIONAL of this petition at maximum density of 10,869.57 square feet per acre with a total of 10,000 square feet. 

 

BUILDING SETBACKS

 

The applicant must comply with the building setbacks and development standards in Article 8.1.3 of the Zoning Resolution.

 

LANDSCAPE STRIPS AND BUFFERS

 

In accordance with Article 12.B.5.B., the applicant must provide a l0-foot landscape strip along Beachland Drive and Roswell Road.   In addition, Article 4.23.1 requires a 10-foot landscape strip along the north property line and a 50-foot buffer and 10-foot improvement setback along the east property line.  The applicant is requesting the following concurrent variance:

 

2003VC-0226 NFC, Part 1, - Delete 10-foot improvement setback along the east property line (Article 4.23.1).

 

According to the revised letter of intent, the applicant intends to comply with all landscape strip and buffer requirements. However, Staff notes that the proposed building and parking lot are located in the 10-foot improvement setback on the revised site plan.*    Staff recommends DENIAL of Part 1 of the concurrent variance request.  In Staff's opinion, any hardship that may be experienced by the applicant with the development of the site at the proposed density will be self-imposed.  At Staff's recommended density, the applicant should be able to comply with the buffer and improvement setback standards.

 

PARKING

 

According to Article 18.2.1 of the Zoning Resolution, the applicant must provide 45 parking spaces.  The applicant is requesting the following concurrent variance to Article 18.2.1:

 

2003VC-0226 NFC – Reduce the required number of parking spaces from 45 to 39 spaces.*

 

Staff recommends DENIAL of Part 2 of the concurrent variance request.  It is the opinion of Staff that the proposed density of development has created a self-imposed hardship.  At Staff's recommended density, the applicant should be able to comply with the parking standards improvement setback standards.

 

OTHER CONSIDERATIONS

 

The applicant is required to provide 6-foot wide sidewalks in accordance with Article 12.B.5.A.2.


 

FINDINGS:

 

(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant.

 

A.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE THAT IS SUITABLE N VIEW OF THE USE AND DEVELOPMENT OF ADJACENT AND NEARBY PROPERTY.

 

FINDING:      The proposed office development, if developed with Staff's Recommended Conditions, is suitable for the subject site given the existing and anticipated office development in the surrounding area.

 

B.        Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property.

 

FINDING:      In Staff's opinion, the proposed development will not have an adverse effect on the use or usability of adjacent and nearby properties if developed in accordance with the Recommended Conditions.

 

 

C.        WHETHER THE PROPERTY TO BE AFFECTED BY THE ZONING PROPOSAL HAS A REASONABLE ECONOMIC USE AS CURRENTLY ZONED.

 

FINDING:      The subject site may have a reasonable use as currently zoned.

 

D.        WHETHER THE ZONING PROPOSAL WILL RESULT IN A USE WHICH WILL OR COULD CAUSE AN EXCESSIVE BURDENSOME USE OF EXISTING STREETS, TRANSPORTATION FACILITIES, UTILITIES, OR SCHOOLS.

 

FINDING:      In Staff's view, the proposed office use may result in an increased demand on the existing transportation facilities.  This project lies in Transportation Service Area 4101.  Staff has advised the applicant that the developer/builder may be required to pay a fair share participation in the expansion of these facilities and services and should contact the Central Impact Fee Office at 730-7800 for more information.

 

E.        WHETHER THE ZONING PROPOSAL IS IN CONFORMITY WITH THE POLICIES AND INTENT OF THE LAND USE PLAN.

 

FINDING:      The proposed office development is consistent with the policies and intent of the Comprehensive Plan, if developed at a maximum density of 10,869.57 square feet per acre and provided the Recommended Conditions are incorporated into the development.

 

LAND USE PLAN MAP:  Office

 

Proposed use/density: Office/16,304.4 Square Feet Per Acre

 

The Comprehensive Plan Land Use Map suggests office uses north, south and west of the subject site.  Residential development at a density of 1 to 2 units per acre is suggested east of the site.  Commercial development is suggested further north of the site. 

 

PLAN POLICIES:

 

            Encourage a broad range of business types and an even distribution of employment

            centers among the major divisions of unincorporated Fulton County.

 

            Provide for the transition of land uses from higher to lower intensity land uses.

 

F.      WHETHER THERE ARE OTHER EXISTING OR CHANGING CONDITIONS AFFECTING THE USE AND DEVELOPMENT OF THE PROPERTY WHICH GIVE SUPPORTING GROUNDS FOR EITHER APPROVAL OR DISAPPROVAL OF THE ZONING

      PROPOSAL.

 

FINDING:      Existing zonings, current non-residential development trends in the area, and adopted land use policies support this request for office development.

 

G.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE WHICH CAN BE CONSIDERED ENVIRONMENTALLY ADVERSE TO THE NATURAL RESOURCES, ENVIRONMENT AND CITIZENS OF FULTON COUNTY.

 

FINDING:      The proposed office development is not considered environmentally adverse affecting natural resources, the environment, or the citizens of Fulton County. 

 

CONCLUSION:

 

Given the existing land uses and zoning in the area, Staff is of the opinion that the proposed use is appropriate for the subject site.  Therefore, Staff recommends that this petition be APPROVED CONDITIONAL for O-I (Office Institutional) at a maximum density of 10,869.57 square feet per acre totaling no more than 10,000 square feet.  Staff recommends DENIAL of Parts 1 and 2 of the concurrent variance request (2003VC-0226 NFC).

 

COMMUNITY ZONING BOARD MEETING

 

On November 18, 2003, the Community Zoning Board recommended DENIAL of the applicant's requests for rezoning.  The Community Zoning Board also recommended DENIAL of Parts 1 and 2 of the concurrent variance.  The applicant submitted a revised site plan on November 21, 2003.  According to the revised site plan, the applicant is no longer requesting a variance to reduce the 50-foot buffer.  However, a variance is needed to allow the encroachment of the proposed building and parking area into the 10-foot improvement setback along the east property line.  In addition, the applicant is requesting the following relief from the parking space requirements in Article 18.2.1 of the Zoning Resolution:  

 

            2003VC-0226 NFC – Reduce the required number of parking spaces from 45 to

            39 spaces.*

 

BOARD OF COMMISSIONERS MEETING

 

            On December 3, 2003, the Board DEFERRED this petition for 90 Days.  The Board            directed Staff to conduct a density study of O-I (Office-Institutional) development in the area.  On March 3, 2004, the Board DEFERRED this petition for 30 Days to allow the applicant and the community to meet.  On March 30, 2004, Staff hosted a meeting          to give the applicant and the community an opportunity to discuss their concerns. No agreement was reached.  However, both parties agreed to continue to communicate.

           


RECOMMENDED CONDITIONS

 

If this petition is approved by the Board of Commissioners, it should be approved O-I (Office-Institutional) CONDITIONAL subject to the owner's agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Board of Commissioners.

 

1.         To the owner's agreement to restrict the use of the subject property as follows:

 

a.         Office/institutional and accessory uses at a maximum density of 10,869.57 square feet of gross floor area per acre zoned or a total gross floor area of 10,000 square feet, whichever is less, but excluding hotels.

 

b.         Limit the height of the building(s) to no more than 2 stories.

 

2.         To the owner's agreement to abide by the following:

 

a.         To the revised site plan received by the Department of Environment and Community Development on November 21, 2003.  Said revised site plan is conceptual only and must meet or exceed the requirements of the Zoning Resolution and these conditions prior to the approval of a Land Disturbance Permit.  Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy.

 

3.         To the owner's agreement to the following site development considerations:

 

a.         No more than 1 exit/entrance on Beachland Drive.  Curb cut location and alignment are subject to the approval of the Fulton County Traffic Engineer.

 

b.         No access shall be allowed from Roswell Road due to inadequate sight distance.

           

4.         To the owner's agreement to abide by the following requirements, dedication and improvements:

 

a.         Reserve for Fulton County along the necessary property frontage of the following roadways, prior to the approval of a Land Disturbance permit, sufficient land as necessary to provide for compliance with the Comprehensive Plan. All building setback lines shall be measured from the dedication but at no time shall a building be allowed inside the area of reservation. All required landscape strips and buffers shall straddle the reservation line so that the reservation line bisects the required landscape strip or buffer. At a minimum, 10 feet of the required landscape strip or buffer shall be located outside the area of reservation. All required tree plantings per Article 4.23 shall be placed within the portion of the landscape strip or buffer that lies outside the area of reservation.

 

Reserve from centerline of Roswell Road (SR) or as may be required by the Georgia Department of Transportation;

 

b.         Dedicate at no cost to Fulton County along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to Fulton County such additional right-of-way as may be required to provide at least 10.5 feet of right-of-way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights-of-way are being improved:

 

55 feet from centerline of Roswell Road (SR 9) or as may be required by the Georgia Department of Transportation.

 

30 feet from centerline of Beachland Drive.

 

c.         Provide signal upgrades at the intersection of Roswell Road and Beachland Drive as required by the Fulton County Traffic Engineer.

 

d.            Provide a traffic impact mitigation plan to reduce the number of vehicular trips generated by the development to the Fulton County Traffic Engineer at            the concept review phase.

5.         To the owner's agreement to abide by the following:

 

a.         Prior to submitting the application for a Land Disturbance Permit (LDP) with the Department of Environment and Community Development, Development Review Division, arrange to meet with the Fulton County Traffic Engineer.  A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit.

 

b.         Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the Fulton County Arborist.  A signed copy of the results of these meetings will be required to be submitted along with the application for an LDP.

 

c.         Prior to submitting the application for an LDP, the developer/engineer shall contact the Public Works Department, Water Services Division, and arrange to meet on-site with an engineer from the Surface Water Management Program (SWMP), who is responsible for review of Storm Water Concept Plan submittals.

 

d.         Prior to submitting the application for an LDP, the developer and/or engineer shall submit to the SWMP, through the Development Review Division, a project Storm Water Concept Plan. This concept plan shall indicate the preliminary location of the storm water management facilities intended to manage the quality and quantity of storm water. The concept plan shall specifically address the existing downstream off-site drainage conveyance system(s) that the proposed development surface runoff will impact, and the discharge path(s) from the outlet of the storm water management facilities to the off-site drainage system(s) and/or appropriate receiving waters. As part of the Storm Water Concept Plan submittal, a preliminary capacity analysis shall be performed by the engineer on the off-site drainage system(s) points of constraint. The capacity analysis shall determine the capacity of all existing constraint points, such as pipes, culverts, etc., the point in the stream channel where the 25 year storm peak flow is the greatest percentage of the channel capacity, and the hydraulic grade elevation at these points. The critical capacity points shall be selected based upon the engineer's field observation, professional judgment and limited field survey data.

 

e.         Where storm water currently drains by sheet flow and it is proposed to be collected to and/or discharged at a point, the discharge from the storm water management facility outlet shall mimic pre-development sheet flow conditions. A description of the method proposed to achieve post-development sheet flow conditions shall be provided as part of the Storm Water Concept Plan.

 

f.          A draft of the Inspection and Maintenance Agreement required by OCGA Section 26-278 shall be submitted to the Department of Public Works with the Storm Water Concept Plan.

 

g.         The Inspection and Maintenance Agreement shall provide that all storm water management/detention facility outlet control structures shall be inspected, photographed and cleaned on a monthly basis, by the owner.  The Inspection and Maintenance Agreement shall require that an annual operation and maintenance report for all storm water management/detention facilities be prepared by a licensed design professional and submitted to the SWMP. The annual report shall include monthly inspections, photographs, and documentation of the cleaning of storm water management/detention facilities outlet control structure(s) as well as an operational assessment of the facilities indicating that they do, or do not, function as intended/designed, and if they do not, a description of the specific actions to be taken to allow the facilities to function as intended/designed.

 

h.         The required Inspection and Maintenance Agreement shall be recorded with the Clerk of Superior Court prior to issuance of an LDP, Grading Permit or Building Permit associated with the development.

 

i.          The engineer/developer is required to submit, along with the application for an LDP, signed documentation verifying approval of the Storm Water Concept Plan.

 

j.          Where paved parking areas (including access aisles) are proposed to exceed 5,000 square feet, the storm water management facilities shall be designed to remove pollutants such as oil, grease and other automobile fluids that may leak from vehicles. A description of the storm water management facilities proposed to achieve the removal of such pollutants shall be submitted with the Storm Water Concept Plan.

 

k.         With the application for an LDP, provide  documentation (such as channel cross-sections, centerline profile, etc.) describing the geometry of all existing natural streams, creeks, or draws within the proposed development boundary and provide details on the Storm Water Management Plan of the post-development channel bank protection measures.

 

l.          The developer/engineer shall demonstrate to the County by engineering analysis submitted with the LDP application, that the  discharge rate and velocity of the storm water runoff leaving the site is restricted to seventy-five percent (75%) of the pre-development conditions for the 1-year frequency storm event, up to and including the ten (10)-year frequency storm event.


 

APPENDIX

 

COMMENTS ON PUBLIC SERVICES AND UTILITIES

 

NOTE: Various Fulton County departments or divisions that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant's conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved, are required to complete the Fulton County Plan Review process prior to the commencement of any construction activity.

 

TRANSPORTATION FACILITIES:

 

Road name: Roswell Road

Classification: Arterial

 

Road name: Beachland Drive

Classification: Local Street

 

Anticipated Traffic Generation Rates:

Average:   309 trips per day

Peak Hour:   41 trips

 

Comments:  The developer may be required to dedicate the necessary right-of-way and make the necessary road improvements to accommodate additional traffic generated as a result of the development.

 

GEORGIA DEPARTMENT OF TRANSPORTATION:

 

Project number STP-7626-00 (060), P.I. No. 762606 is a sidewalk project from I-285 to the Atlanta City Limits. The project design ha not started as of this date. The applicant shall construct this sidewalk to current ADA standards. Current standards are available from the Department on its web site.

 

HEALTH DEPARTMENT:

 

Comments:

 

The Fulton County Health Department does not anticipate any health problems with this proposed

development, provided public water and public sanitary sewer are required to serve the site.

 

OFFICE OF ENVIRONMENTAL AFFAIRS:

 

All construction shall be in accordance with the regulations found in the Fulton County Comprehensive

Stormwater Management Ordinance and all other applicable rules of Fulton County, State and Federal

Governments.

 

All construction and land disturbing activities should be designed to minimize soil erosion, protect State

Waters and prevent off-site sedimentation, in accordance with the regulations found in the Fulton County

Soil Erosion and Sedimentation Control Ordinance and all other applicable rules of Fulton County, State and

Federal Governments.

 

Buffers and improvement setbacks are effective environmental measures that minimize runoff and soil

erosion.  In the event that compliance with the Fulton County Zoning Resolution as determined by Fulton

County does not represent a hardship to the applicant, all undisturbed buffers and improvement setbacks

should be maintained

 

WATER AND WASTEWATER (SEWER):

 

WATER:

 

Anticipated water demand: 1,667 gallons per day

 

This project is within the Atlanta jurisdiction.

 

Comments: This information does not guarantee that adequate water volume and pressure are available at this time or will be adequate upon application of permits. Please contact the Department of Public Works for more information.

 

SEWER:

 

Basin: Nancy Creek

Treatment Plant: R.M. Clayton

Anticipated sewer demand: 1,500 gallons per day

 

The nearest wastewater pipeline to this project is +/-25 linear feet located in Land Lot 92, District 17.

 

Comments: This information does not guarantee that adequate sewer capacity is available at this time or will be available upon application of permits. Please contact the Department of Public Works for more information.

 

DRAINAGE:

 

Flood Plain: FEMA Map No. 13121C0144E , Floodplain 0%

 

STREAM BUFFER PROTECTION:

 

State Waters:

 

Confirmation of a State Water: Due to the brevity of the site information it is not possible to positively identify all drainage courses until an arborist site visit is made (the Fulton County Arborist is the official who delineates State Waters).

 

Comment: Should a State Waters be identified on sites in North Fulton County, a 25-foot undisturbed buffer measured from the top of bank on both sides of the stream shall be required.

 

USGS   Blueline Tributary:

 

Confirmation of a Blueline Tributary: 1968 United States Survey (USGS) Quadrangle Maps

 

No, United States Geographical Survey Map Sandy Springs, Georgia Quadrangle

 

BOARD OF EDUCATION: No Comment

 

PARKS AND RECREATION: No Comment

 

BUILDING CODES

 

This proposed development must meet all applicable regulations pursuant to the Building Code, 2000 edition, and Life Safety Code, 1997 edition.

 

TAX ASSESSOR:

 

Property Tax ID#: 17-92-4-41

 

Taxes on the subject property are up-to-date.

 

FIRE MARSHAL:

 

Comment: The applicant will be required to indicate compliance with all National Fire Protection Association and International Fire Protection Association standards at the time of application for a Land Disturbance Permit.

 

Fire Station: 10; Battalion: 4

 

Impact: This project should not have an adverse impact on the fire services needed.

 

POLICE DEPARTMENT ZONING IMPACT STATEMENT:

 

Beat:   20

 

Impact Statement on Beat:

Current calls for service:  9,623

Projected calls for service: Unknown

**** Current average response time: 10 minutes

 

** Increase in the number of residents:  29

 

* Increase in E-911 calls  for service (police, fire, E.M.S.):  72.7

 

*** Increase in the number of traffic accidents: 1.5

 

PROJECTED IMPACT ON DEMAND FOR POLICE SERVICES:

 

It is the policy of the Fulton County Police Department to answer all calls for service regardless of the impact of a particular development. However, two of the most noticeable indicators of the quality of police service will be as follows: As demands for service increase, police response time to calls will increase. Time available for proactive neighborhood/business patrol will decrease and crime prevention efforts will decline.

 

The Police Department does anticipate a significant impact on demand for police services.

 

*           Based on 1998 population of 222,794 and 1998 total calls for service of 584,054 (194,242 for police services).

**          Based on average single family residence population of four, average apartment population of two and 1.96 persons per 1,000 gross square feet of space.

***        Based on 1998 accident calls of 8,009.

****       Based on average response time of 10.7 minutes (North Fulton) and 8 minutes (South Fulton).

*****      Based on average of two (2) cars per single family residence.

 

Note: The demand for police service is determined by socio-economic, legislative and other forces which do not lend themselves to predictability. Therefore, projections are made from historical data only. (There has been a 13.96% increase in calls for police service from 1996 to 1997).

 

EMERGENCY SERVICES:

 

If zoning petition is approved there will be an increase in E911 call volume.

 

Addressing of all proposed properties identified within the petition must comply with the County's addressing standards to reduce the likelihood of a delay in response time.

 

All gate codes must be provided to the local 911center providing call reception for emergency and non-emergency requests.