PETITION No. 2006Z -0059 SFC


 

PROPOSED ZONING                     C-1 (COMMUNITY BUSINESS) - *3,947.37 SQUARE FEET PER ACRE

 

PROPOSED USE                               *RETAIL - 15,000 SQUARE FEET

                                                                       

EXISTING ZONING                           R-3 (RESIDENTIAL)

 

EXISTING USE                                    UNDEVELOPED

 

LAND USE MAP                                  COMMUNITY/LIVE-WORK

 

LOCATION                                              BAKERS FERRY ROAD (WEST SIDE):

                                                                        468.55 FEET OF FRONTAGE

 

CAMP CREEK PARKWAY (SR-6) (EAST SIDE):

                                                                        534.99 FEET OF FRONTAGE

 

                                                                        PARCEL SIZE 3.8 ACRES

 

                                                                        SMALL AREA 512

 

                                                                        LL 109, DISTRICT 14F

 

                                                                        COMMISSION DISTRICT 7

                                                                       

OWNER                                                    CLARA PEPPERS

 

PETITIONER                                         CBA INVESTMENTS, INC.

 

REPRESENTATIVE                          GEORGE PUVVADA

 


 

APPLICANT'S INTENT        To develop 15,000 square feet of retail uses at a density of 3,947.37 square feet per acre.



Department of Environment and Community Development

Recommendation

 

APPROVAL CONDITIONAL

 

 

Community Zoning Board Recommendation

July 19, 2006

 

DENIAL

 

 

Board of Commissioners' Action

August 2, 2006

 

DEFERRAL FOR 60 DAYS

 

The Board of Commissioners deferred this petition for 60 days to allow the applicant to meet with the community.

 

THIS WILL BE THE SECOND PUBLIC HEARING BEFORE THE BOARD OF COMMISSIONERS.

 


SUBJECT SITE AND SURROUNDING AREA:

 

SUBJECT SITE:  The subject site has frontage on Bakers Ferry Road and Camp Creek Parkway.  Consisting of 3.8 acres, the site is zoned R-3 (Residential) and is undeveloped.

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: NON-RESIDENTIAL

 

**         North side of Fulton Industrial Boulevard - Use: Quicktrip (Existing)

Petition: 95Z -145 SFC

Zone: M-1 (Light Industrial)

Density: 4,495 square feet per acre, 73,000 square feet total

 

**         Further North - Use: McDonalds Restaurant (Existing)

Petition: 98Z -030 SFC

Zone: C-1 (Community Business)

Density: 3,333.3 square feet per acre, 6,000 square feet total

Height: 1-story

 

**         North - Use: Camp Creek Station (Zaxby's; Waffle House, Cleaners) (Existing)

Petition: 2003Z-0066 SFC

Zone: C-1 (Community Business)

Density: 5,285.5 square feet per acre, 55,500 square feet

 

**         North Pending Petition: 2006Z -0061 SFC

Proposed Zone: C-1 to C-2 (Car Wash & Oil Change Facility)

 

**         Northeast - Use: United States Post Office, Concentra/United Forms (Existing)

Petition: Z74-082 SFC

Zone: C-1 (Community Business)

Density: 9,453.4 square feet per acre, 29,400 square feet total

 

**         Northeast - Use: Industrial Park (Undeveloped)

Petition: Z74-081 SFC

Zone: M-1A (Industrial Park)

Density: 13,321 square feet per acre, 104,300 square feet total

 

**         South of Boat Rock Road - Use: Residential, Retail, Community Services (Under Development)

            Petition: 2001Z -0079 SFC

            Zone: MIX (Mixed Use)

Density: Single Family - 1.01 units per acre; Townhouses - .68 units per acre; Live/Work Units - .23 units per acre; Apartments - 2.47 units per acre; Assisted Living Facility - 75 units; Retail & Office; 1,771.4 square feet per acre; Community Services - 538.12 square feet per acre  

            Minimum Lot Size: 7,500 Square Feet for single family Residences.

           

**         West - Use: Millerzell Logistics (Existing)

Petition: 95Z -091 SFC

Zone: M-1A (Industrial Park)

Density: 19,575 square feet per acre, 425,752 square feet total

 

**         Further West - Use: Lakeview Industrial Park (Existing)

Petition: Z78 -088 SFC

Zone: M-1A (Industrial Park)

Density: None Stated

 

**         Northwest; north side of Fulton Industrial Boulevard - Use: Riverview Distribution Center (Existing)

            Petition: Z61-008 SFC

            Zone: M-1A (Industrial Park)

            Density: None Stated

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: RESIDENTIAL

 

* *        East - Use: Monte Vista Townhomes (Existing)

Petition: Z73-022 SFC

Zone: TR (Townhouse Residential)

Density: 8.4 units per acre

Minimum Heated Floor Area: 1,120 square feet

 

* *        Southeast - Use: Ashford at Springlake Apartments (Existing)

Petition: Z74-062 SFC

Zone: A (Medium Density Apartments)

Density: 4.8 units per acre

 

* *        South - Use: Single Family Residences (Existing)

Petition: N/A

Zone: R-3 (Residential)

 

**         Southwest intersection of Camp Creek Parkway & Boat Rock Road - Use: Westchase Park Apartments (Existing)

            Petition: 66Z -079 SFC

            Zone: A (Apartments)

            Density: 224 Units/ 18.01 Units Per Acre

           

**         Southwest intersection of Camp Creek Parkway & Boat Rock Road

Use: Westchase Glen Subdivision (Existing)

            Petition: 2003Z -0059 SFC

            Zone: CUP (Community Unit Plan)

Density: 67 Single Family Residences/ 3.86 Units Per Acre; 17 Townhomes/ 0.99 Units Per Acre 

Minimum Lot Size: 4,400 Square Feet/ Single Family Residences; 2,046 Square Feet/ Townhomes 

Minimum Heated Floor Area: 1,550 Square Feet/ Single Family Residences; 1,450 Square Feet/ Townhomes 

 

            There have been no RECENT DENIALS and there are no MISCELLANEOUS USES/ZONINGS in the immediate area.

 

SITE PLAN ANALYSIS:

 

Based on the applicant's *revised site plan submitted to the Department of Environment and Community Development on July 21, 2006 Staff offers the following considerations:

 

LAND USE AND DENSITY

 

*The applicant is requesting to rezone the site from R-3 (Residential) to C-1 (Community Business) to develop 15,000 square feet square feet of retail uses at a density of 3,947.37 square feet per acre. The proposed uses are compatible with existing non-residential uses north of the subject site at the intersection of Camp Creek Parkway and Fulton Industrial Boulevard.  Staff notes that the requested density is compatible and consistent with other approved non-residential uses in the area.  Pursuant to 2003Z -0066 SFC and 98Z -0030 SFC, the Board of Commissioners approved C-1 (Community Business) zonings north of the subject site at densities of 5,285.5 square feet per acre and 3,333.3 square feet per acre.  The proposed rezoning is consistent with current Plan Policies and the 2025 Comprehensive Plan Land Use Map which suggests community live-work development for the subject site. Pursuant to the Focus Fulton 2005-2025 Comprehensive Plan, community live-work allows commercial and office uses at a maximum density of 15,000 square feet per acre which is consistent with the applicant's request of 3,947.37 square feet per acre. Therefore, Planning Staff recommends APPROVAL CONDITIONAL of this petition subject to the attached Recommended Conditions.

 

BUILDING SETBACKS

 

Pursuant to Article 9.1.3 of the Fulton County Zoning Resolution, a minimum 40-foot building setback is required along Camp Creek Parkway and Bakers Ferry Road.  The submitted site plan indicates compliance to this standard.

 

LANDSCAPE STRIPS AND BUFFERS

 

The following landscape strips and buffers are applicable to the subject site pursuant to the Sandtown Overlay District and Article 4.23 of the Fulton County Zoning Resolution:

 

40-foot buffer with an additional 10-foot improvement setback along Camp Creek Parkway;

 

25-foot buffer with an additional 10-foot improvement setback along the south property line adjacent to R-3 (Residential) zoning district; and

 

15-foot landscape strip along Bakers Ferry Road

 

10-foot landscape strip along the north interior property line adjacent to C-1 (Community Business) zoned property.

 

Staff notes that the submitted site plan complies with the required landscape strips and buffers.

 

PARKING

 

Article 18 of the Zoning Resolution requires 5 parking spaces per 1,000 square feet for the proposed retail use.  Staff notes 75 parking spaces are required for 15,000 square feet of retail uses. The *revised site plan indicates 69 parking spaces.  However, given the amount of available acreage on the subject site, Staff is of the opinion that the applicant can comply with the minimum required parking spaces.

 

ENVIRONMENT

 

The Environmental Site Analysis Report is sufficient and satisfies the requirement of the Fulton County Zoning Resolution. A field survey of the site was conducted by County Staff to verify areas addressed in the ESA report. Compliance with County erosion control guidelines would mitigate developmental impacts. The site does not contain wetlands, floodplains, streams, steep slopes, historical sites and sensitive plants and animal species.

 

OTHER CONSIDERATIONS

 

As previously noted, the subject site is located within the Sandtown Overlay District.  If approved, the site plan must comply with all applicable standards at the time of application for a Land Disturbance Permit. 

 

COMMUNITY ZONING BOARD RECOMMENDATION

 

On July 19, 2006, the Community Zoning Board recommended DENIAL of the petition.  Community opposition was present at the meeting. 

 

SINCE BOC MEETING ON 08/02/06

 

The applicant has met with representatives of the community and reached a private agreement with the Boat Rock Homeowners Association.

 

 

 

FINDINGS:

 

(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant.

 

A.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE THAT IS SUITABLE IN VIEW OF THE USE AND DEVELOPMENT OF ADJACENT AND NEARBY PROPERTY.

 

FINDING:      The proposed retail development is suitable for the subject site considering the existing and anticipated non-residential uses in the immediate area, if developed in accordance with Staff's Recommended Conditions.

 

B.        Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property.

 

FINDING:      In Staff's opinion, the proposed retail development will not have an adverse effect on the use or usability of adjacent and nearby properties if developed in accordance with the Recommended Conditions.

 

C.        WHETHER THE PROPERTY TO BE AFFECTED BY THE ZONING PROPOSAL HAS A REASONABLE ECONOMIC USE AS CURRENTLY ZONED.

 

FINDING:      The subject site may have a reasonable use as currently zoned.

 

D.        WHETHER THE ZONING PROPOSAL WILL RESULT IN A USE WHICH WILL OR COULD CAUSE AN EXCESSIVE BURDENSOME USE OF EXISTING STREETS, TRANSPORTATION FACILITIES, UTILITIES, OR SCHOOLS.

 

FINDING:      The proposed retail development is not anticipated to have an adverse impact on the existing public facilities and services in this area, provided the Recommended Conditions are incorporated into the development of the subject site.

 

E.        WHETHER THE ZONING PROPOSAL IS IN CONFORMITY WITH THE POLICIES AND INTENT OF THE LAND USE PLAN.

 

FINDING:      The proposed retail development is consistent with the policies and intent of the Comprehensive Plan, if developed in accordance with the attached Recommended Conditions.

 

LAND USE PLAN MAP:

 

Proposed use/density: Retail/ 3,947.37 Square Feet Per Acre

                                        

The 2025 Comprehensive Land Use Plan suggests Community Live-Work node at the northeast, southeast and southwest intersections of Camp Creek Parkway and Fulton Industrial Boulevard. Beyond the node in the northeast and southeast quadrants, residential development is suggested at a density of 2 to 3 units per acre.  Business Park development is suggested at the northwest intersection of Camp Creek Parkway and Fulton Industrial Boulevard.

 

PLAN POLICIES:

 

Direct future non-residential development to highway interchanges and intersections of major roads in a pattern of mixed-use, activity nodes.

 

Encourage development in areas where basic public facilities exist or are being improved, and discourage development in areas which would require inefficient or uneconomical extension of public facilities.

 

Encourage appropriate building heights which are compatible with the surrounding area and are consistent with transitional and other land use policies.

 

F.         WHETHER THERE ARE OTHER EXISTING OR CHANGING CONDITIONS AFFECTING THE USE AND DEVELOPMENT OF THE PROPERTY WHICH GIVE SUPPORTING GROUNDS FOR EITHER APPROVAL OR DISAPPROVAL OF THE ZONING PROPOSAL.

 

FINDING:      Existing zonings, current commercial development trends in the area, and adopted land use policies support this request for commercial development.

 

G.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE WHICH CAN BE CONSIDERED ENVIRONMENTALLY ADVERSE TO THE NATURAL RESOURCES, ENVIRONMENT AND CITIZENS OF FULTON COUNTY.

 

FINDING:      The proposed retail development is not considered environmentally adverse affecting natural resources, the environment, or the citizens of Fulton County. 

 

CONCLUSION:

 

Provided Staff's Recommended Conditions are incorporated into the development of the site, the proposed commercial use is consistent with the policies and intent of the Comprehensive Plan and with approved zonings in the area.  Therefore, Staff recommends this petition be APPROVED CONDITIONAL subject to the attached Recommended Conditions.

 

 

RECOMMENDED CONDITIONS

 

If this petition is approved by the Board of Commissioners, it should be APPROVED C-1 (Community Business) CONDITIONAL subject to the owner's agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Board of Commissioners.

 

1.         To the owner's agreement to restrict the use of the subject property as follows:

 

a.         *Retail, service commercial and/or office and accessory uses, including all exterior food and beverage service areas, at a maximum density of 3,947.37 gross square feet per acre zoned or a total of 15,000 square feet, whichever is less, but excluding hotels, convenience stores with gas pumps, freestanding fast food restaurants and commercial amusements.

 

2.         To the owner's agreement to abide by the following:

 

a.         To the *revised site plan received by the Department of Environment and Community Development on July 21, 2006.  Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Resolution and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy.

 

3.         To the owner's agreement to abide by the following traffic requirements, dedications and improvements:

 

a.         Reserve for Fulton County along the necessary property frontage of the following roadways, prior to the approval of a Land Disturbance permit, sufficient land as necessary to provide for compliance with the Comprehensive Plan. All building setback lines shall be measured from the dedication but at no time shall a building be allowed inside the area of reservation. All required landscape strips and buffers may straddle the reservation line so that the reservation line bisects the required landscape strip or buffer. At a minimum, 10 feet of the required landscape strip or buffer shall be located outside the area of reservation. All required tree plantings per Article 4.23 shall be placed within the portion of the landscape strip or buffer that lies outside the area of reservation.

 

45 feet from centerline of Bakers Ferry Road.

 

b.         Dedicate at no cost to Fulton County along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to Fulton County such additional right-of-way as may be required to provide at least 10.5 feet of right-of-way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights-of-way are being improved:

 

75 feet from centerline of Camp Creek Parkway (SR-6) or as may be required by the Georgia Department of Transportation.

 

30 feet from centerline of Bakers Ferry Road.

 

            c.         No curb cut access allowed on (Limited Access) Camp Creek Parkway

(SR-6).

 

4.         To the owner's agreement to abide by the following:

 

a.         Prior to submitting the application for a (LDP) with the Department of Environment and Community Development, Development Review Division, arrange to meet with the Fulton County Traffic Engineer.  A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit.

 

b.         Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the Fulton County Arborist.  A signed copy of the results of these meetings will be required to be submitted along with the application for an LDP.

 

 c.        Prior to submitting the application for an LDP, the developer/engineer shall contact the Public Works Department, Water Services Division, and arrange to meet on-site with an engineer from the Surface Water Management Program (SWMP), who is responsible for review of Storm Water Concept Plan submittals.

 

d.         Prior to submitting the application for an LDP, the developer and/or engineer shall submit to the SWMP, through the Development Review Division, a project Storm Water Concept Plan.  This concept plan shall indicate the preliminary location of the storm water management facilities intended to manage the quality and quantity of storm water.  The concept plan shall specifically address the existing downstream off-site drainage conveyance system(s) that the proposed development surface runoff will impact, and the discharge path(s) from the outlet of the storm water management facilities to the off-site drainage system(s) and/or appropriate receiving waters.  As part of the Storm Water Concept Plan submittal, a preliminary capacity analysis shall be performed by the engineer on the off-site drainage system(s) points of constraint.  The capacity analysis shall determine the capacity of all existing constraint points, such as pipes, culverts, etc. from the point of storm water discharge at the proposed development site boundary downstream to the confluence of the receiving drainage course at a point where the drainage area is at least ten times the proposed development site area and the next downstream drainage area having a drainage area of fifty acres or more.  The critical capacity points shall be selected based upon the engineer's field observation, professional judgment, and limited field survey data.  The analysis shall identify the downstream properties pre and post-development 100-year water surface elevations, and for any post-development water surface elevation increase exceeding 0.05 feet, the developer shall acquire the applicable offsite drainage easement to accommodate the 100-year storm flow through impacted properties.  Where Fulton County has completed a model of the basin, it shall be used by the developer in the analyses.

 

e.         Where storm water currently drains by sheet flow and it is proposed to be collected to and/or discharged at a point, such that the discharge from the storm water management facility outlet crosses a property line, such discharge shall mimic pre-development sheet flow conditions.  A description of the method proposed to achieve post-development sheet flow conditions shall be provided as part of the Storm Water Concept Plan.  Should the method to achieve sheet flow across an external property line be unsuccessful, the developer shall acquire an easement(s) from the point of discharge to a point down gradient at a live dry weather stream sufficient to contain the 25 year storm flow or other location as approved by the Director of Public Works.  This condition will not apply when the storm water management facility is designed and approved to discharge directly to a stream or watercourse.

 

f.          A draft of the Inspection and Maintenance Agreement required by Fulton County Code Section 26-278 shall be submitted to the Department of Public Works with the Storm Water Concept Plan.

 

g.         The Inspection and Maintenance Agreement shall provide that all storm water management/detention facility outlet control structures shall be inspected, photographed, and cleaned, if necessary, on a monthly basis, by the owner.  The Inspection and Maintenance Agreement shall require that the design engineer shall prepare an operation and maintenance guidance document, for use by the owner and/or any professionals retained by the owner, to plainly describe the basic operational function of the facility(ies), including a description of a permanent marker post(s) which shall indicate that the level of sediment which, if exceeded, requires sediment removal.  The Inspection and Maintenance Agreement shall require an annual operation and maintenance report for all storm water management/detention facilities be prepared by a licensed design professional and submitted to the SWMP.  The annual report shall include monthly inspections, photographs, and documentation of the cleaning of storm water management/detention facilities outlet control structure(s) as well as an operational assessment of the facilities indicating that they do, or do not, function as described in the design guidance document (described above), and if they do not, a description of the specific actions to be taken to allow the facilities to function as intended.

 

h.         The required Inspection and Maintenance Agreement shall be recorded with the Clerk of Superior Court prior to issuance of an LDP, Grading Permit, or Building Permit associated with the development.

 

i.          The engineer/developer is required to submit, along with the application for an LDP, signed documentation verifying approval of the Storm Water Concept Plan.

 

j.          Where paved parking areas (including access aisles) are proposed to exceed 5,000 square feet, the storm water management facilities shall be designed to reduce pollutants such as oil, grease and other automobile fluids that may leak from vehicles.  A general description, or concept, of the storm water management facilities proposed to achieve the removal of such pollutants shall be submitted with the Storm Water Concept Plan.  A detailed design of such facilities shall be included in applicable documents for a land disturbance permit.

 

k.         With the application for an LDP, provide  documentation (such as channel cross-sections, centerline profile, etc.) describing the geometry of those  existing natural streams, creeks, or draws within the proposed development boundary which in the design engineer's judgment are at risk of erosion due to increased flow, provide a description of the basis utilized in judging areas to be at risk, and provide details on the Storm Water Management Plan of the post-development channel bank protection measures.

 

l.          The developer/engineer shall demonstrate to the County by engineering analysis submitted with the LDP application, that the  discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions for the 1-year frequency storm event, up to and including the ten (10)-year frequency storm event.

 

m.        Drainage from all disturbed areas shall be collected and conveyed to a storm water management facility provided as part of the development.  The Storm Water Concept Plan shall identify any proposed areas with incidental and minor release of storm water not conveyed to such facilities, subject to the approval of the Director of Public Works.  Plans for any land disturbance permit shall show all proposed drainage patterns for the proposed development after its completion.  Any incidental release of unmanaged or untreated storm flows from any disturbed portion of the developed property shall be allowed only with the approval of the Director of Public Works.  Other than minimal incidental flows shall be specifically approved by the Director of Public Works.  Bypass flows will not be permitted except from undisturbed areas within a buffer or other protected easement.  Final plans shall provide for collection, conveyance and treatment of all approved incidental flows from developed lots or parcels, individual residences or building structures.

 

n.         Storm water management facility(ies) volumes shall be designed to achieve water quality treatment, channel protection, over bank flood protection and extreme flood protection, in accordance with the Georgia State Storm water Manual, except that the duration of release for water quality treatment shall be 48 hours.

 


APPENDIX

 

COMMENTS ON PUBLIC SERVICES AND UTILITIES

 

NOTE: Various Fulton County departments or divisions that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant's conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved, are required to complete the Fulton County Plan Review process prior to the commencement of any construction activity.

 

TRANSPORTATION FACILITIES:

 

Road name: Bakers Ferry Road

Classification: Collector

Level of Service: C or better

 

Road name: Camp Creek Parkway (SR-6)

Classification: Principal Arterial

Level of Service: C or better

 

Anticipated Traffic Generation Rates:

Average: 947 trips per day

Peak Hour: 64 AM trips; 96 PM trips

 

HEALTH DEPARTMENT:

 

The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site.

 

Since this proposed development is a public and/or place of employment, compliance is required by the Fulton County Health Department with the Clean Indoor Air Ordinance.  The Ordinance requires the posting of adequate signage for a smoke free area.  A designated smoking area may be established at the discretion of the owner in accordance with this ordinance.

 

If this proposed development includes a food service facility, the owner must submit kitchen plans for review and approval by this department before issuance of a building permit and beginning construction.  The owner must obtain a food service permit prior to opening.

 

If this proposed development includes a public swimming pool as defined in the regulations including spas, whirlpools, etc., the owner or contractor must submit plans and approval by this department and must obtain a Health Department permit to construct before issuance of a building permit.  Also, the owner of the facility must obtain a Health Department permit to operate the pool prior to opening.

 

This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval.

 

WATER AND WASTEWATER (SEWER):

 

WATER:

 

Anticipated water demand: 7,778 gallons per day

 

This project is within the Atlanta jurisdiction.

 

Comments: This information does not guarantee that adequate water volume and pressure are available at this time or will be adequate upon application of permits. Please contact the Department of Public Works for more information.

 

SEWER:

 

Basin: Utoy Creek

Treatment Plant: Utoy Creek

Anticipated sewer demand: 7,000 gallons per day

 

The nearest wastewater pipeline to this project is +/- 70 linear feet located in Land Lot 109, District 14FF.

 

Comments: This information does not guarantee that adequate sewer capacity is available at this time or will be available upon application of permits. Please contact the Department of Public Works for more information.

 

DRAINAGE:

 

Flood Plain: FEMA Map Number 13121C0327E; Floodplain = 0%

 

BOARD OF EDUCATION:

 

No impact on school enrollment.

 

TAX ASSESSOR:

 

Property Tax ID#: 14F-0109-LL-109-5

 

Taxes on the subject property are up-to-date.

 

FIRE MARSHAL:

 

Fire Station: #11

 

Impact: 1) Increase in road congestion.

            2) Increase in water demand.

            3) Increase in 911 calls.

            4) Will require 2 means of access.

 

POLICE DEPARTMENT ZONING IMPACT STATEMENT:

 

Beat: 41

 

Impact Statement on Beat:

Current calls for service: 11,570

Projected calls for service: Unknown

**** Current average response time: 7 minutes

 

** Increase in the number of residents: 159

 

* Increase in E-911 calls  for service (police, fire, E.M.S.): 399

 

*** Increase in the number of traffic accidents: 8

 

PROJECTED IMPACT ON DEMAND FOR POLICE SERVICES:

 

It is the policy of the Fulton County Police Department to answer all calls for service regardless of the impact of a particular development. However, two of the most noticeable indicators of the quality of police service will be as follows: As demands for service increase, police response time to calls will increase. Time available for proactive neighborhood/business patrol will decrease and crime prevention efforts will decline.

 

The Police Department does anticipate a significant impact on demand for police services.

 

*           Based on 1998 population of 222,794 and 1998 total calls for service of 584,054 (194,242 for police services).

**          Based on average single family residence population of four, average apartment population of two and 1.96 persons per 1,000 gross square feet of space.

***        Based on 1998 accident calls of 8,009.

****       Based on average response time of 10.7 minutes (North Fulton) and 8 minutes (South Fulton).

*****      Based on average of two (2) cars per single family residence.

 

Note: The demand for police service is determined by socio-economic, legislative and other forces which do not lend themselves to predictability. Therefore, projections are made from historical data only. (There has been a 13.96% increase in calls for police service from 1996 to 1997)

 

EMERGENCY SERVICES:

 

If zoning petition is approved there will be an increase in E911 call volume.  The increase may negatively affect the Department's call answering speed and service level.

 

Increased traffic volume without road improvements may increase response times of emergency response vehicles thereby reducing effective delivery of emergency services.

 

Addressing of all proposed properties identified within the petitions must comply with the County's Addressing Standard to reduce the likelihood of delay in response time.

 

Hartsfield-Jackson Atlanta International Airport

City of Atlanta, Department of Aviation (DOA)

 

The proposed project is located approximately 9.3 miles northwest of the Airport and received a Cursory Review.