PETITION No. 2006Z -0086 SFC

 

 

PROPOSED ZONING                     C-2 (COMMERCIAL) - 5,221.6 SQUARE FEET PER ACRE

 

PROPOSED USE                               CAR WASH – 3,240 SQUARE FEET

 

EXISTING ZONING                           MIX (MIXED USE) – 99Z -098 SFC

 

EXISTING USE                                    UNDEVELOPED

 

LAND USE MAP                                  NEIGHBORHOOD LIVE-WORK

 

LOCATION                                              OLD NATIONAL HIGHWAY (SR 279) (WEST SIDE):

                                                                        132 FEET OF FRONTAGE

 

                                                                        PARCEL SIZE 0.6205 ACRES

 

                                                                        SMALL AREA 704

 

                                                                        LL 125, DISTRICT 13

 

                                                                        COMMISSION DISTRICT 7

                                                                       

OWNER                                                    S. S. BLACKSTOCK, LLC

 

PETITIONER                                         THE COLLABORATIVE FIRM

 

REPRESENTATIVE                          MICHAEL HIGHTOWER

 

 

APPLICANT'S INTENT             To develop a 3,240 square foot car wash facility on 0.6205 acres at a density of 5,221.6 square feet per acre.

 


Department of Environment and Community Development

Recommendation

 

APPROVAL CONDITIONAL: 2006Z -0086 SFC

 

 

Community Zoning Board Recommendation

September 19, 2006

 

APPROVAL CONDITIONAL: 2006Z -0086 SFC

 

The Community Zoning Board recommended approval of this petition per Staff's recommendations.

 


SUBJECT SITE AND SURROUNDING AREA:

 

SUBJECT SITE: The 0.6205 acre subject site is zoned MIX (Mixed Use), pursuant to 99Z -098 SFC, office/commercial at a density of 7,971.25 square feet per acre zoned, 642,482 square foot total; residential – 152 units at a density of 1.89 units per acre zoned. The subject site is located on the west side of Old National Highway (SR 279) just south of Flat Shoals Road. The Majority of the approved mixed use development to the west is currently under development as a Wal Mart Super Store and shopping center. The subject site is currently undeveloped.

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: NON-RESIDENTIAL

 

**         North - Use: Liquor Store (Existing)

Petition: 97Z -160 SFC

Zone: C-1 (Community Business)

Density: 4,962 square feet per acre for a total of 6,500 square feet

 

**         North - Use: Chevron Convenience Store (Existing)

Petition: Z68-146 SFC

Zone: C-1 (Community Business)

Density: None Stated

 

**         North - Mrs. Winners Restaurant (Existing)

Petition: Z83-097 SFC

Zone: C-1 (Community Business)

Density: 2,957 square feet per acre, 2,868 total square feet

 

**         Northwest - Use: Bank (Approved)

Petition: 2006Z -0011 SFC

Zone: C-1 (Community Business)

Density: 3,222.58 square feet per acre

 

**         Further North, across Flat Shoals Road - Use: BP Convenience Store (Existing)

Petition: Z69-076 SFC

Zone: C-1 (Community Business)

Density: 13,670 square feet per acre

 

**         Further North, across Flat Shoals Road - Use: Main Street South Fulton Shopping Center (Kroger) (Existing)

Petition: 96Z -068 SFC, Z88-072 SFC and Z69-102 SFC

Zone:  C-1 (Community Business)

Density: 4,978 square feet per acre, 136,458 total square feet (96Z-068 SFC); 10,000 square feet per acre, 47,000 total square feet (Z88-072 SFC); 12,670 square feet pre acre (Z69-102 SFC)    

Height: 2-stories

 

**         Northeast across Old National Highway - Use: Frozen Palace (Existing)

Petition: Z80-054 SFC

Zone: C-1 (Community Business)

Density: 5,975 square feet per acre

 

**         Northeast quadrant of Old National Highway & Flat Shoals Road - Use: Advance Auto Parts (Existing)

Petition: 96Z -085 SFC

Zone: C-1 (Community Business)

Density: 6,919 square feet per acre, 11,070 total square feet

Height: 1-story

 

**         East across Old National Highway - Use: Assorted Office Uses (Existing)

Zone: O-I (Office-Institutional)

 

 

 USE:

 

 PETITION:

 

 DENSITY:

 

 Franks & Associates

 

Z82-021 SFC

 

 None stated

 

 Eason Law Firm

 

Z86-083 SFC

 

 Office In Existing Structure

 

 Atlanta Eye Consultants

 

Z90-068 SFC

 

 1,987 sq. ft. per acre

 2,960 total sq. ft

 

Day Care Facility

 

99Z -141 SFC

 

 1,744.97 sq. ft. per acre

 2,600 total sq. ft.

 

 Foot and Ankle Specialty Center

 

Z93-083 SFC

 

 1,333 sq. ft. per acre

 1,700 total sq. ft.

 

 Woman's Health Services

 

Z93-057 SFC

 

 1,785 sq. ft. per acre

 2,500 total sq. ft.

 

 Family Dentistry

 

Z93-097 SFC

 

 1,333 sq. ft. per acre

 2,000 total sq. ft.

 

**         South - Use: Goodyear Service Center (Existing)

Petition: Z86 -079 SFC

Zone: C-1 (Community Business)

Density: 9,320 square feet per acre

 

**         South/WestWal Mart Shopping Center (Under Development), Approved for Mixed Use Development

            Petition: 99Z -098 SFC

            Zone: MIX (Mixed Use)

Density: Office/Commercial - 7,971.25 square foot per acre, 642,482 square foot total;

Residential -152-units, 1.89 units per acre based on total acreage zoned

Height: 2-stories

 

**         Further Northwest - Use: Live Oak Baptist Church (Existing)

Zone: SUB A (Residential), AG-1 (Agricultural)   

Petition: Z57-037 SFC/U88-089 SFC (Day Care Facility)

Density: None stated for the church, 72 children for the day care facility

 

NEARBY AND ADJACENT PROPERTIES/ZONINGS:  RESIDENTIAL

 

**         Further Northwest, across Flat Shoals Road - Providence Place Subdivision (Existing)

            Petition: 2002Z-0093 SFC

Zone: TR (Townhouse Residential)

Density: 9.0 units per acre

Minimum Heated Floor Area: 1,200 square feet

 

**         Further East, across Old National Highway (SR 279) – Townhomes (Approved)

            Petition: 2003Z-0107 SFC

Zone: TR (Townhouse Residential)

Density: 5.8 units per acre, 104 total units

Minimum Heated Floor Area: 1,200 square feet

 

**         Further Southeast, across Old National Highway (SR 279) Madison Place Subdivision (Existing)

            Petition: 2002Z -0043 SFC

Zone: TR (Townhouse Residential)

Density: 7.19 units per acre

Minimum Heated Floor Area: 1,200 square feet

 

**         MISCELLANEOUS USES/ZONINGS IN THE AREA

 

**         There have been no RECENT DENIALS and there are no MISCELLANEOUS USES/ZONINGS in the immediate area.

 

SITE PLAN ANALYSIS:

 

Based on the applicant's site plan submitted to the Department of Environment and Community Development on July 25, 2006, Staff offers the following considerations:

 

LAND USE AND DENSITY

 

The applicant is proposing to rezone the subject site from MIX (Mixed Use), pursuant to 99Z -098 SFC, to C-2 (Commercial) to develop a 3,240 square foot car wash facility on 0.6205 acres, for a density of 5,221.6 square feet per acre. The applicant's request is consistent with the Comprehensive Plan Land Use Map's suggestion for Live-Work Neighborhood which allows commercial development on the subject site and the surrounding properties. The petition is also consistent with existing development and approved zonings and densities in the area. Therefore, Staff recommends the applicant's petition be APPROVED CONDITIONAL subject to the attached Recommended Conditions.

 

BUILDING SETBACKS

 

Article 9.2.3 of the Zoning Resolution requires a minimum of 40-foot front yard setback. The applicant's site plan indicates compliance with all building setback requirements.

 

LANDSCAPE STRIPS AND BUFFERS

 

In accordance with Article 12D.3.A.1 of the Zoning Resolution, a 15 foot landscape strip is required along Old National Highway (SR 279). Article 12D.3.A.2 of the Zoning Resolution requires a 10-oot landscape strip along interior property line adjacent to a non-residential zoning and/or use. The applicant's site plan indicates compliance with the landscape strip requirements.

 

PARKING

 

Article 18.2.1 of the Zoning Resolution requires the applicant to provide 5 parking spaces per 1,000 square feet of building area for commercial development. Based on the proposed total area of 3,240 square feet, 16 parking spaces are required. The applicant's site plan indicates compliance with the parking requirements.

 

TRANSPORTATION

 

Fulton County Traffic anticipates the traffic generation rates as follows: 731 average trips per day, 20 trips at the a.m. peak hour, and 65 trips at the p.m. peak hour. To help mitigate the impact of increased traffic, the Fulton County Traffic Engineer is requiring the applicant to comply with traffic recommendations in the Recommended Conditions.

 

ENVIRONMENTAL

 

The Environmental Site Analysis Report is sufficient and satisfies the requirement of the Fulton County Zoning Resolution. A field survey of the site was conducted by County Staff to verify areas addressed in the ESA report. Compliance with County erosion control guidelines would mitigate developmental impacts. The site does not contain wetlands, floodplains, streams, steep slopes, historical sites or sensitive plants and animal species.

 

OTHER CONSIDERATIONS

 

Pursuant to Article 34.5.3 of the Fulton County Zoning Resolution, sidewalks are required along the entire length of the property along Old National Highway (SR 279). The applicant shall indicate compliance with all sidewalk requirements at the time of application for Land Disturbance Permit.

 

The subject site lies within the area covered by the Old National Overlay District. The applicant will be required to demonstrate compliance with the overlay district standards at the time of permitting.

 

Staff notes that existing and approved building heights in the area are 1-story. Staff is of the opinion that in order to maintain the character of the area for bulk and height, building height should not exceed 1-story. Staff will reflect this in the Recommended Conditions.

___________________________________________________________________________

 

FINDINGS:

 

(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant.

 

A.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE THAT IS SUITABLE IN VIEW OF THE USE AND DEVELOPMENT OF ADJACENT AND NEARBY PROPERTY.

 

FINDING:      The proposed car wash, if developed with Staff's Recommended Conditions, is suitable for the subject site given the existing and anticipated commercial development in the surrounding area.

 

B.        Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property.

 

FINDING:      In Staff's opinion, the proposed car wash will not have an adverse effect on the use or usability of adjacent and nearby properties if developed in accordance with the Recommended Conditions.

 

C.        WHETHER THE PROPERTY TO BE AFFECTED BY THE ZONING PROPOSAL HAS A REASONABLE ECONOMIC USE AS CURRENTLY ZONED.

 

FINDING:      The subject site may have a reasonable use as currently zoned.

 

D.        WHETHER THE ZONING PROPOSAL WILL RESULT IN A USE WHICH WILL OR COULD CAUSE AN EXCESSIVE BURDENSOME USE OF EXISTING STREETS, TRANSPORTATION FACILITIES, UTILITIES, OR SCHOOLS.

 

FINDING:      Staff does not anticipate a significant impact on public services and facilities.  However, some impact on the transportation system is expected but should be mitigated with compliance to the attached Recommended Conditions for project improvements.

 

E.        WHETHER THE ZONING PROPOSAL IS IN CONFORMITY WITH THE POLICIES AND INTENT OF THE LAND USE PLAN.

 

FINDING:      The proposed car wash is consistent with the suggestion of the Plan Map as well as policies and intent of the Comprehensive Plan.  The petition is also consistent with Board action and similar uses in the area.

 

LAND USE PLAN MAP: Neighborhood Live-Work 

 

Proposed use/density: Car Wash/ 5,221.6 Square Feet Per Acre

 

The Comprehensive Plan Land Use Map suggests the subject site and the surrounding properties as appropriate for Neighborhood Live-Work which allows commercial development. Further east and further west, the Plan Map suggests residential development at 3 to 5 units per acre.

 

PLAN POLICIES:

 

Direct future non-residential development to highway interchanges and intersections of major roads in a pattern of mixed-use, activity nodes.

 

Encourage a broad range of business types and an even distribution of employment            centers among the major divisions of unincorporated Fulton County.

 

F.         WHETHER THERE ARE OTHER EXISTING OR CHANGING CONDITIONS AFFECTING THE USE AND DEVELOPMENT OF THE PROPERTY WHICH GIVE SUPPORTING GROUNDS FOR EITHER APPROVAL OR DISAPPROVAL OF THE ZONING PROPOSAL.

 

FINDING:      Plan policies support this request for commercial development if approved per Staff's Recommended Conditions.

 

G.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE WHICH CAN BE CONSIDERED ENVIRONMENTALLY ADVERSE TO THE NATURAL RESOURCES, ENVIRONMENT AND CITIZENS OF FULTON COUNTY.

 

FINDING:        The proposed use is not considered environmentally adverse affecting natural resources, the environment, or the citizens of Fulton County.

 

CONCLUSION:

 

Provided Staff's Recommended Conditions are incorporated into the development of the site, the proposed car wash is consistent with similar commercial uses and Board action in the area. Therefore, Staff recommends this petition be APPROVED CONDITIONAL, subject to the attached Recommended Conditions.

 

 

RECOMMENDED CONDITIONS

 

If this petition is approved by the Board of Commissioners, it should be APPROVED C-2 (Commercial) CONDITIONAL subject to the following enumerated conditions.  Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Board of Commissioners.

 

1.         To the owner's agreement to restrict the use of the subject property as follows:

 

a.         Car wash and accessory uses at a maximum density of 5,221.6 gross square feet per acre zoned or a total of 3,240 square feet, whichever is less.

 

b.         Limit the height of the building(s) to no more than 1-story.

 

2.         To the owner's agreement to abide by the following:

 

a.         To the site plan received by the Department of Environment and Community Development on July 25, 2006.  Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Resolution and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy.

 

3.         To the owner's agreement to abide by the following requirements, dedication and improvements:

 

a.         Dedicate at no cost to Fulton County along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to Fulton County such additional right-of-way as may be required to provide at least 10.5 feet of right-of-way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights-of-way are being improved:

 

50 feet from centerline of Old National Highway (SR 279).

 

4.         To the owner's agreement to abide by the following:

 

a.         Prior to submitting the application for a (LDP) with the Department of Environment and Community Development, Development Review Division, arrange to meet with the Fulton County Traffic Engineer.  A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit.

 b.        Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the Fulton County Arborist.  A signed copy of the results of these meetings will be required to be submitted along with the application for an LDP.

 

c.       Prior to submitting the application for an LDP, the developer/engineer shall contact the Public Works Department, Water Services Division, and arrange to meet on-site with an engineer from the Surface Water Management Program (SWMP), who is responsible for review of Storm Water Concept Plan submittals.

 

d.         Prior to submitting the application for an LDP, the developer and/or engineer shall submit to the SWMP, through the Development Review Division, a project Storm Water Concept Plan.  This concept plan shall indicate the preliminary location of the storm water management facilities intended to manage the quality and quantity of storm water.  The concept plan shall specifically address the existing downstream off-site drainage conveyance system(s) that the proposed development surface runoff will impact, and the discharge path(s) from the outlet of the storm water management facilities to the off-site drainage system(s) and/or appropriate receiving waters.  As part of the Storm Water Concept Plan submittal, a preliminary capacity analysis shall be performed by the engineer on the off-site drainage system(s) points of constraint.  The capacity analysis shall determine the capacity of all existing constraint points, such as pipes, culverts, etc. from the point of storm water discharge at the proposed development site boundary downstream to the confluence of the receiving drainage course at a point where the drainage area is at least ten times the proposed development site area and the next downstream drainage area having a drainage area of fifty acres or more.  The critical capacity points shall be selected based upon the engineer's field observation, professional judgment, and limited field survey data.  The analysis shall identify the downstream properties pre and post-development 100-year water surface elevations, and for any post-development water surface elevation increase exceeding 0.05 feet, the developer shall acquire the applicable offsite drainage easement to accommodate the 100-year storm flow through impacted properties.  Where Fulton County has completed a model of the basin, it shall be used by the developer in the analyses.

 

e.       Where storm water currently drains by sheet flow and it is proposed to be collected to and/or discharged at a point, such that the discharge from the storm water management facility outlet crosses a property line, such discharge shall mimic pre-development sheet flow conditions.  A description of the method proposed to achieve post-development sheet flow conditions shall be provided as part of the Storm Water Concept Plan.  Should the method to achieve sheet flow across an external property line be unsuccessful, the developer shall acquire an easement(s) from the point of discharge to a point down gradient at a live dry weather stream sufficient to contain the 25 year storm flow or other location as approved by the Director of Public Works.  This condition will not apply when the storm water management facility is designed and approved to discharge directly to a stream or watercourse.

 

f.          A draft of the Inspection and Maintenance Agreement required by Fulton County Code Section 26-278 shall be submitted to the Department of Public Works with the Storm Water Concept Plan.

 

g.         The Inspection and Maintenance Agreement shall provide that all storm water management/detention facility outlet control structures shall be inspected, photographed, and cleaned, if necessary, on a monthly basis, by the owner.  The Inspection and Maintenance Agreement shall require that the design engineer shall prepare an operation and maintenance guidance document, for use by the owner and/or any professionals retained by the owner, to plainly describe the basic operational function of the facility(ies), including a description of a permanent marker post(s) which shall indicate that the level of sediment which, if exceeded, requires sediment removal.  The Inspection and Maintenance Agreement shall require an annual operation and maintenance report for all storm water management/detention facilities be prepared by a licensed design professional and submitted to the SWMP.  The annual report shall include monthly inspections, photographs, and documentation of the cleaning of storm water management/detention facilities outlet control structure(s) as well as an operational assessment of the facilities indicating that they do, or do not, function as described in the design guidance document (described above), and if they do not, a description of the specific actions to be taken to allow the facilities to function as intended.

 

h.         The required Inspection and Maintenance Agreement shall be recorded with the Clerk of Superior Court prior to issuance of an LDP, Grading Permit, or Building Permit associated with the development.

 

i.          The engineer/developer is required to submit, along with the application for an LDP, signed documentation verifying approval of the Storm Water Concept Plan.

 

j.          Where paved parking areas (including access aisles) are proposed to exceed 5,000 square feet, the storm water management facilities shall be designed to reduce pollutants such as oil, grease and other automobile fluids that may leak from vehicles.  A general description, or concept, of the storm water management facilities proposed to achieve the removal of such pollutants shall be submitted with the Storm Water Concept Plan.  A detailed design of such facilities shall be included in applicable documents for a land disturbance permit.

 

k.         With the application for an LDP, provide  documentation (such as channel cross-sections, centerline profile, etc.) describing the geometry of those  existing natural streams, creeks, or draws within the proposed development boundary which in the design engineer's judgment are at risk of erosion due to increased flow, provide a description of the basis utilized in judging areas to be at risk, and provide details on the Storm Water Management Plan of the post-development channel bank protection measures.

 

l.          The developer/engineer shall demonstrate to the County by engineering analysis submitted with the LDP application, that the  discharge rate and velocity of the storm water runoff resulting from the development is restricted to seventy-five percent (75%) of the pre-development conditions for the 1-year frequency storm event, up to and including the ten (10)-year frequency storm event.

 

m.        Drainage from all disturbed areas shall be collected and conveyed to a storm water management facility provided as part of the development.  The Storm Water Concept Plan shall identify any proposed areas with incidental and minor release of storm water not conveyed to such facilities, subject to the approval of the Director of Public Works.  Plans for any land disturbance permit shall show all proposed drainage patterns for the proposed development after its completion.  Any incidental release of unmanaged or untreated storm flows from any disturbed portion of the developed property shall be allowed only with the approval of the Director of Public Works.  Other than minimal incidental flows shall be specifically approved by the Director of Public Works.  Bypass flows will not be permitted except from undisturbed areas within a buffer or other protected easement.  Final plans shall provide for collection, conveyance and treatment of all approved incidental flows from developed lots or parcels, individual residences or building structures.

 

n.         Storm water management facility(ies) volumes shall be designed to achieve water quality treatment, channel protection, over bank flood protection and extreme flood protection, in accordance with the Georgia State Storm water Manual, except that the duration of release for water quality treatment shall be 48 hours.

 

o.         Approval of this Zoning Case and/or associated Concept Plan that depicts proposed conditions that are inconsistent with county design requirements and standards does not constitute a waiver of such requirements, unless specifically stipulated during the zoning case hearing, by the Board of Commissioners.

 

 


APPENDIX

 

COMMENTS ON PUBLIC SERVICES AND UTILITIES

 

NOTE: Various Fulton County departments or divisions that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant's conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved, are required to complete the Fulton County Plan Review process prior to the commencement of any construction activity.

 

TRANSPORTATION FACILITIES:

 

Road name: Old National Highway (SR 279)

Classification: Minor Arterial

Level of Service: C or better

 

Anticipated Traffic Generation Rates:

Average: 731 trips per day

Peak Hour: 20 trips

 

HEALTH DEPARTMENT:

 

The Fulton County Health Department recommends that the applicant be required to connect the proposed development to public water and public sanitary sewer available to the site.

 

Since this proposed development is a public and/or place of employment, compliance is required by the Fulton County Health Department with the Clean Indoor Air Ordinance.  The Ordinance requires the posting of adequate signage for a smoke free area.  A designated smoking area may be established at the discretion of the owner in accordance with this ordinance.

 

This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval.

 

WATER AND WASTEWATER (SEWER):

 

WATER:

 

Anticipated water demand: 3,333 gallons per day

 

This project is within the Atlanta jurisdiction.

 

Comments: This information does not guarantee that adequate water volume and pressure are available at this time or will be adequate upon application of permits. Please contact the Department of Public Works for more information.

 

SEWER:

 

Basin: Morning Creek

Treatment Plant: Camp Creek

Anticipated sewer demand: 3,000 gallons per day

 

The nearest wastewater pipeline to this project is onsite, located in Land Lot 125, District 13.

 

Comments: This information does not guarantee that adequate sewer capacity is available at this time or will be available upon application of permits. Please contact the Department of Public Works for more information.

 

DRAINAGE:

 

Flood Plain: FEMA Map No. 13121C0478E. Approximate floodplain = 0%.

 

BOARD OF EDUCATION:

 

No comments.

 

TAX ASSESSOR:

 

Property Tax ID#: 13-0125-LL-077-2

 

Taxes on the subject property are up-to-date.

 

FIRE MARSHAL:

 

Fire Station: Battalion 1, Station 7.

 

Impact: Will increase in water demands and road congestion.

 

POLICE DEPARTMENT ZONING IMPACT STATEMENT:

 

Beat: 35

 

Impact Statement on Beat:

Current calls for service: 10,252

Projected calls for service: Unknown

**** Current average response time: 10 minutes

 

** Increase in the number of residents: 6.0

 

* Increase in E-911 calls  for service (police, fire, E.M.S.): 15.0

 

*** Increase in the number of traffic accidents: 0.3

 

PROJECTED IMPACT ON DEMAND FOR POLICE SERVICES:

 

It is the policy of the Fulton County Police Department to answer all calls for service regardless of the impact of a particular development. However, two of the most noticeable indicators of the quality of police service will be as follows: As demands for service increase, police response time to calls will increase. Time available for proactive neighborhood/business patrol will decrease and crime prevention efforts will decline.

 

The Police Department does anticipate a significant impact on demand for police services.

 

*           Based on 1998 population of 222,794 and 1998 total calls for service of 584,054 (194,242 for police services).

**          Based on average single family residence population of four, average apartment population of two and 1.96 persons per 1,000 gross square feet of space.

***        Based on 1998 accident calls of 8,009.

****       Based on average response time of 10.7 minutes (North Fulton) and 8 minutes (South Fulton).

*****      Based on average of two (2) cars per single family residence.

 

Note: The demand for police service is determined by socio-economic, legislative and other forces which do not lend themselves to predictability. Therefore, projections are made from historical data only. (There has been a 13.96% increase in calls for police service from 1996 to 1997)

 

EMERGENCY SERVICES:

 

If zoning petition is approved there will be an increase in E911 call volume.  The increase may negatively affect the Department's call answering speed and service level.

 

Increased traffic volume without road improvements may increase response times of emergency response vehicles thereby reducing effective delivery of emergency services.

 

Addressing of all proposed properties identified within the petitions must comply with the County's Addressing standards to reduce the likelihood of delay in response time.

 

Hartsfield-Jackson Atlanta International Airport

City of Atlanta, Department of Aviation (DOA)

 

The proposed project is located approximately 2.7 miles south of the Airport.

 

Is the proposed project located under protected airspace for the Airport?

 Yes - X         No

 

If yes, the development will require the completion of Federal Aviation Administration (FAA) form 7460-1, Notice of Proposed Construction or Alteration.

 

Is the proposed project located within an area of significant (65 DNL or higher) aircraft noise exposure?   {Based on Estimated 2010 Noise Exposure Contours}

 

 Yes