PETITION No. 2008Z -0019 SFC

2008U -0012 SFC

2008VC-0028 SFC

 

 

PROPOSED ZONING                     M-1 (LIGHT INDUSTRIAL) WITH A USE PERMIT (ARTICLE 19.4.39) – 2,201.26 SQUARE FEET PER ACRE

 

PROPOSED USE                               WRECKER SERVICE WITH OFFICE –

3,500 SQUARE FEET

 

EXISTING ZONING                           AG-1 (AGRICULTURAL)

 

EXISTING USE                                    SINGLE FAMILY RESIDENCE

 

LAND USE MAP                                  NO LAND USE PLAN DESIGNATION

 

LOCATION                                              ROOSEVELT HIGHWAY (SR 14/US 29) (EAST SIDE):

                                                                       

363.64 FEET OF FRONTAGE

 

                                                                        PARCEL SIZE 1.59 ACRES

 

                                                                        SMALL AREA 615

 

                                                                        LL 100, DISTRICT 9F

 

                                                                        COMMISSION DISTRICT 7

 

                                                                        THE SITE IS CURRENTLY ON SEPTIC

 

OWNER                                                    SANFORD JONES

 

PETITIONER                                         LARRY’S WRECKER SERVICE, INC

 

REPRESENTATIVE                          MICHELLE JACKAM

 

 

APPLICANT’S INTENT                    To rezone the subject site from AG-1 (Agricultural) to M-1 (Light Industrial) with a special Use Permit to develop a wrecker/towing service with a 3,500 square-foot office on 1.59 acres at an overall density of 2,201.26 square feet per acre. The applicant is also requesting a 4-part concurrent variance as follows:

 

Part 1 – Allow a storage facility within 3 miles of an existing facility (Article 19.4.39, Section B.1)   

 

Part 2 – Reduce the required 200-foot buffer and 10-foot improvement setback to a 25-foot buffer and no improvement setback along the south property line (Article 19.4.39, Section B.2).

 

Part 3 – Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the east property line (Article 19.4.39, Section B.2).

 

Part 4 - Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the north property line (Article 19.4.39, Section B.2).

 

 

Department of Environment and Community Development

Recommendation

 

APPROVAL CONDITIONAL: 2008Z -0019 SFC

APPROVAL CONDITIONAL: 2008U -0012 SFC

APPROVAL CONDITIONAL: 2008VC-0028 SFC (All Parts)

 

 

Community Zoning Board Recommendation

October 21, 2008

 

DEFERRAL FOR UP TO 90 DAYS

 

 

Community Zoning Board Recommendation

November 18, 2008

 

APPROVAL CONDITIONAL: 2008Z -0019 SFC

APPROVAL CONDITIONAL: 2008U -0012 SFC

APPROVAL CONDITIONAL: 2008VC-0028 SFC (All Parts)

 

 

SUBJECT SITE AND SURROUNDING AREA:

 

SUBJECT SITE: The subject site consists of 1.59 acres and is zoned AG-1 (Agricultural).  The site is currently developed with a single family residence. 

 

            NEARBY AND ADJACENT PROPERTIES/ZONINGS: NON-RESIDENTIAL

 

**         North – Use: D&M Battery Sales, Inc (Existing)

            Zone: C-2 (Commercial)/M-1 (Light Industrial)

            Petition: Z76-021 SFC/Z57 -017 SFC

 

**         North – Use: Used Car Sales (Existing)

            Zone: M-1 (Light Industrial)

            Petition: Z57-017 SFC

 

**         Further North – Use: Food Mart Chevron (Existing)

            Zone: C-1 (Community Business)

            Petition: Z57-018 SFC

 

**         Further North - Use: Fulton County Department of Family and Children Services (Existing)

            Zone: C-1 (Community Business)

            Petition: Z74-084 SFC

 

**         Further, Further North – Use: South Fulton Service Center (existing)

            Zone: AG-1 (Agricultural)

           

**         South – Use: Family Dollar Store (Existing)

            Union City Limits

 

**         South – Use: Oil Change Facility (Existing)

            Union City Limits

 

**         South – Use: Pacecar Express Gas Station (Existing)

            Union City Limits

 

**         South – Use: Shell Gas Station (Existing)

            Union City Limits

 

**         Southwest – Use: Emission Testing Station (Existing)

            Union City Limits

 

**         West – Use: Roosevelt Landfill (Existing)

            Union City Limits

 

**         Northwest – Use: Christopher Tire Shop (Existing)

            Union City Limits

**         Further, Further Northwest - Use: Stonewall Operation CenterFulton County Facility (Existing)

            Zone: AG-1 (Agricultural)

 

NEARBY AND ADJACENT PROPERTIES/ZONINGS: RESIDENTIAL

 

**         Further Northwest along Cochran Drive and Stonewall Tell Road – Use: Scattered Single Family Residences (Existing)

Zone: AG-1 (Agricultural)

 

**         Southwest along Westbrook RoadUse: Scattered Single Family Residences (Existing)

Union City Limits.

 

MISCELLANEOUS USES AND ZONINGS IN THE AREA:

 

**         South/East/West - City limits of Union City. 

 

**         East Atlanta & West Point Railroad Right-of-Way. 

 

**         There have been no RECENT DENIALS in the immediate area.

 

SITE PLAN ANALYSIS:

 

Based on the applicant's revised site plan submitted to the Department of Environment and Community Development on November 20, 2008, Staff offers the following considerations:

 

LAND USE AND DENSITY

 

The applicant is proposing to rezone the subject site from AG-1 (Agricultural) to M-1 (Light Industrial) with a Use Permit for a wrecker/towing service with a 3,500 square foot office on 1.59 acres at an overall density of 2,201.26 square feet per acre. 

 

Staff notes that there is no Land Use Map designation for the subject site per the Fulton County 2025 Land Use Plan Map. However, the Plan Map recommends that the adjacent properties to the east and northeast as appropriate for industrial use and the properties to the northwest and to the north as appropriate for office and commercial use respectively. Staff further notes that the adjacent properties to the south and to the north are developed with various commercial uses, and the adjacent property to the east is the right-of-way of the Atlanta & West Point Railroad. The property to the west across Roosevelt Highway (SR 14/US 29) is developed with the Roosevelt Landfill facility. Staff is of the opinion that the applicant’s proposed development is consistent and in harmony with the existing development in the immediate area of the subject site. Therefore, Staff recommends APPROVAL CONDITIONAL of the proposed development subject to the attached Recommended Conditions.

 

BUILDING SETBACKS

 

Pursuant to Article 10.2.3.B of the Zoning Resolution, minimum building setbacks apply to the applicant’s request as follows:

 

40-foot building setback along Roosevelt Highway (SR 14/US 29) (front yard)

0-foot building setback along the south property lines (side yards)

0-foot building setback along the north property line (side yard)

0-foot building setback along the east property line (rear yard)

 

The applicant’s site plan shows compliance with the building setback requirements. 

 

LANDSCAPE STRIPS AND BUFFERS

 

The subject site is required to provide the following landscape strips and undisturbed buffers with improvement setbacks per Article 19.4.39.B of the Fulton County Zoning Resolution.

 

A 50-foot buffer and 10-foot improvement setback along the Roosevelt Highway (SR 14/US 29) frontage 

A 200-foot buffer and 10-foot improvement setback along the east property line

A 200-foot buffer and 10-foot improvement setback along the south property line

A 200-foot buffer and 10-foot improvement setback along the north property line

 

The applicant’s site plan does not indicate compliance with the requirements. Therefore, the applicant is requesting concurrent variance as follows:

 

Part 2- Reduce the required 200-foot buffer and 10-foot improvement setback to a 25-foot buffer and no improvement setback along the south property line (Article 19.4.39.B.2)

 

Staff notes that the properties to the south are located within Union City and are developed with various commercial uses. Staff further notes that the southern property line of the subject site abuts the adjacent commercial use’s detention pond and parking lot. Staff is of the opinion that the applicant has demonstrated a valid hardship due to the size of the property and that the variance, if granted, would have a minimal adverse effect on the adjacent properties and would be in harmony with the existing development in the immediate area. Therefore, Staff recommends APPROVAL CONDITIONAL of Part 2 of the concurrent variance subject to the attached Recommended Conditions.

 

Part 3 - Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the east property line (Article 19.4.39.B.2)

 

Part 4- Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the north property line (Article 19.4.39.B.2)

 

Staff notes that the adjacent property to the north is zoned C-2 (Commercial) pursuant to Z76 -021 SFC and M-1 (Light Industrial) pursuant to 57Z -017 SFC and is developed with the D&M Battery service and the property to the east is the right-of-way of the Atlanta & West Point Railroad. Staff is of the opinion that the applicant has demonstrated a valid hardship due to the size of the property and that the variance, if granted, would have a minimal adverse effect on the adjacent properties and would be in harmony with the existing development in the immediate area. Therefore, Staff recommends APPROVAL CONDITIONAL of Parts 3 & 4 of the concurrent variance subject to the attached Recommended Conditions.

 

CONCURRENT VARIANCE

 

Pursuant to Article (19.4.39.B.1) of the Fulton County Zoning Resolution, a new salvage, storage and/or junk yard facility shall not be located within 3 miles of an existing junk yard facility. Staff notes that the subject site is approximately 0.84 miles (4,400 feet) of an existing salvage, storage and/or junk yard facility located further northeast, at the northeast quadrant of Hunter Road and Roosevelt Highway (SR 14/US 29). Therefore, the applicant is requesting a concurrent variance as follows:

 

Part 1 - To allow a new salvage, storage and/or junk yard facility within 3 miles of an existing salvage, storage, and/or junk yard facility (Article 19.4.39.B.1).

 

Staff is of the opinion that although the subject site does not comply with the use separation requirements, the variance, if granted would have a minimal adverse effect on adjacent properties and that the applicant’s proposed development would be in harmony with the existing development in the immediate area. Staff is further of the opinion that the required buffers and landscape strips would minimize any adverse effect to adjacent properties. Therefore, Staff recommends APPROVAL CONDITIONAL of Part 1 of the concurrent variance subject to the attached Recommended Conditions.

 

PARKING

 

The site plan shows a total of 6 parking spaces on the east side of the existing residential structure to be converted to office.  Article 18.2.1 requires one parking space per employee and 1 space per 5,000 square feet of building. Based on the 3,500 square foot building area and 3 employees, a minimum of 4 parking spaces are required. The applicant’s site plan indicates compliance with the requirement.

 

ENVIRONMENT

 

The Environmental Impact Report is sufficient and satisfies the requirement of the Fulton County Zoning Resolution. A field survey of the site was conducted by County Staff to verify areas addressed in the EIR. The proposed site will be used for a private towing company. Vehicles will be transferred from one location to another location.

 

According to the 2000 census data the proposed site is located in an area of low/moderate income and minority concentration. According to the EIR the proposed activity on the site does not pose an adverse risk to the surrounding area and impact on noise, air quality, water quality and wildlife in the existing area. According to County GIS a historic resource is located on the proposed site. The existing house will be converted into an office for the business. No thermal or explosive hazards and hazardous waste will be used on site. Compliance with federal, state, and local environmental regulations will mitigate any adverse developmental impacts associated with this project. The site does not contain streams, wetlands, floodplains, steep slopes, sensitive plants and animal species.

 

OTHER CONSIDERATIONS

 

The applicant is proposing a height limit of one and one-half (1½) stories for the proposed wrecker/towing facility which would be compatible with the area.  Therefore, Staff has included the height limitation in the Recommended Conditions.

 

In order to minimize any adverse visual impact, Staff recommends that the applicant provide the following screening measures which Staff shall include in the attached Recommended Conditions:

 

The 100 percent opaque fence along Roosevelt Highway (SR 14/US 29) shall be 8-foot in height and constructed of a durable man-made material such as vinyl or other composite material in an earth tone color with no barb-wire or razor-wire extending above the top of the fence.

 

Provide a minimum 6-foot tall evergreen plant material at the time of buffer planting along Roosevelt Highway (SR14/US 29).  

 

Access to Roosevelt Highway (SR 14/US 29) shown on the applicant’s revised site plan dated November 20, 2008 shall be permitted and installed by the owner should the existing access from Houston Street with (no identified right-of-way or easement) be prohibited. Staff shall reflect this in the attached Recommended Conditions.

 

Staff notes that the existing structures on the subject site would encroach within the required buffers and improvement setback. Staff further notes that Article 4.3.E, Section 1 of the Zoning Resolution allows for the required buffers and setbacks to be reduced to the extent necessary to allow existing structures to remain. Staff shall reflect this in the attached Recommended Conditions.  

 

 

FINDINGS:

 

(Article 28.4.1) Planning Staff shall, with respect to each zoning application, investigate and make a recommendation with respect to factors A. through G., below, as well as any other factors it may find relevant.

 

A.                 WHETHER THE ZONING PROPOSAL WILL PERMIT A USE THAT IS SUITABLE IN VIEW OF THE USE AND DEVELOPMENT OF ADJACENT AND NEARBY PROPERTY.

 

FINDING:      The proposed wrecker/towing facility, if developed with Staff’s Recommended Conditions, is suitable for the subject site considering the existing uses in the immediate area.

B.        Whether the zoning proposal will adversely affect the existing use or usability of adjacent or nearby property.

 

FINDING:      In Staff's opinion, the proposed development will not have an adverse effect on the use or usability of adjacent and nearby properties if developed in accordance with the Recommended Conditions.

 

C.        WHETHER THE PROPERTY TO BE AFFECTED BY THE ZONING PROPOSAL HAS A REASONABLE ECONOMIC USE AS CURRENTLY ZONED.

 

FINDING:      The subject site may have a reasonable use as currently zoned.

 

D.        WHETHER THE ZONING PROPOSAL WILL RESULT IN A USE WHICH WILL OR COULD CAUSE AN EXCESSIVE BURDENSOME USE OF EXISTING STREETS, TRANSPORTATION FACILITIES, UTILITIES, OR SCHOOLS.

 

FINDING:      Staff does not anticipate a significant impact on public services and facilities.  However, some impact on the surrounding transportation system is expected but should be mitigated with compliance to the attached Recommended Conditions for project improvements.

 

E.        WHETHER THE ZONING PROPOSAL IS IN CONFORMITY WITH THE POLICIES AND INTENT OF THE LAND USE PLAN.

 

FINDING:      The proposed wrecker/towing facility is consistent with the policies and intent of the Comprehensive Plan and Plan Map designations in the surrounding area provided the Recommended Conditions are incorporated into the development.

 

LAND USE PLAN MAP:    No Land Use Plan designation.  

 

Proposed use/density: Wrecker/towing facility – 2,201.26 square feet per acre

 

PLAN POLICIES:

 

Direct future non-residential development to highway interchanges and intersections of major roads in a pattern of mixed-use, activity nodes.

 

Encourage appropriate building heights which are compatible with the surrounding area and are consistent with transitional and other land use policies.

 

Provide for the transition of land uses from higher to lower densities and between different land uses.

 

F.         WHETHER THERE ARE OTHER EXISTING OR CHANGING CONDITIONS AFFECTING THE USE AND DEVELOPMENT OF THE PROPERTY WHICH GIVE SUPPORTING GROUNDS FOR EITHER APPROVAL OR DISAPPROVAL OF THE ZONING PROPOSAL.

 

FINDING:      Existing zonings and current non-residential development trends in the area support this request.

 

G.        WHETHER THE ZONING PROPOSAL WILL PERMIT A USE WHICH CAN BE CONSIDERED ENVIRONMENTALLY ADVERSE TO THE NATURAL RESOURCES, ENVIRONMENT AND CITIZENS OF FULTON COUNTY.

 

FINDING:      The proposed use is not considered environmentally adverse affecting natural resources, the environment, or the citizens of Fulton County. 

 

BOARD OF COMMISSIONERS POLICY

 

Article 19.4.39 of the Zoning Resolution provides for salvage, storage and/or junk facility in an M-1 (Light Industrial) and M-2 (Heavy Industrial) zoned districts with an approved Use Permit.  Staff notes that Pursuant to Article 19.4.39 of the Zoning Resolution, the Board of Commissioners has previously approved rezoning with a Use Permit for salvage, storage and/or junk facility in Fulton County. Similar Use Permit recently approved by the Fulton County Board of Commissioners is as follows:

 

On September 1, 1999, pursuant to 99Z -059 SFC/99U -033 SFC, the Board of Commissioners approved the petitioner’s request to rezone from AG-1 (Agricultural), M-1 (Light Industrial) pursuant to Z85 -006 SFC, Z72 -139 SFC and C-2 (Commercial) to M-2 (Heavy Industrial) and a Use Permit for a 37,400 square foot salvage/storage facility further northeast on Roosevelt Highway (SR 14/US 29).

 

In the interest of the public health, safety and welfare, the Board of Commissioners may exercise limited discretion in evaluating the site proposed for a use that requires a Use Permit. In exercising such discretion pertaining to the subject use, the Board of Commissioners shall consider each of the following as outlined in Article 19.2.4 of the Zoning Resolution; Use Permit Considerations. Staff has reviewed said items pertaining to the subject use, and, offers the following comments:

 

(1)       Whether the proposed use is consistent with the Land Use or Economic Development plans adopted by the Board of Commissioners:

 

Provided the applicant complies with the Recommended Conditions of this petition and the Use Permit requirements of Article 19.4.39 of the Zoning Resolution, the proposed development is consistent with the intent and following policies of the Comprehensive Plan:

 

Direct future non-residential development to highway interchanges, and intersections of major roads in a pattern of mixed-use activity nodes.

 

Provide for the transition of land uses from higher to lower densities and between different land uses.

 

Encourage appropriate building heights which are compatible with the surrounding area and are consistent with transitional and other land use policies.

 

(2)       Compatibility with land uses and zoning districts in the vicinity of the property for which the Use Permit is proposed;

 

The proposed wrecker/towing facility is compatible with existing land uses and zoning in the surrounding area, if it is developed in accordance with Staff’s Recommended Conditions and other Fulton County development standards.  

 

(3)       Whether the proposed use may violate local, state and/or federal statutes, ordinances or regulations governing land development;

 

The proposed use does not violate any known statutes, ordinances or regulations governing land development.

 

(4)       The effect of the proposed use on traffic flow, vehicular and pedestrian, along adjoining streets;

 

Staff is of the opinion that the proposed wrecker/towing facility will not generate a significant increase in traffic. Staff anticipates that the proposed use will have a minimal impact on traffic. 

 

(5)       The location and number of off-street parking spaces;

 

The applicant’s site plan indicates 6 parking spaces located to the east of the existing residential structure to be converted to the office for the proposed development. Article 18 of the Fulton County Zoning Resolution requires one parking space per employee plus 1 parking space per 5,000 square feet. Based on a total of 3,500 square feet building space and approximately three employees as indicated by the applicant, a minimum of 4 parking spaces are required. The applicant’s site plan indicates compliance with the parking space requirements. Staff is of the opinion that compliance to the required buffers and landscape strips shall mitigate any impact on adjacent properties.

 

(6)       The amount and location of open space;

 

Staff is of the opinion that given the required building setbacks, the size of the existing structure and the nature of the proposed use as an outdoor wrecker/towing service, there would be adequate open space for the site.

(7)       Protective screening;

 

The required buffers as conditioned by Staff and improvement setback along Roosevelt Highway (SR 14/US 29) and interior property lines as well as the required 6-foot high opaque fence inside the buffers will screen the proposed use from adjacent properties and public right-of-way, thus minimizing negative impacts.

 

(8)       HOURS AND MANNER OF OPERATION;

 

The applicant indicates that the hours of operation would be 24 hours a day, 7 days a week (24/7). Given the existing non-residential uses in the area, Staff is of the opinion that the applicant’s proposed hours of operation would have a minimal adverse effect on the adjacent properties. 

 

(9)       OUTDOOR LIGHTING;

 

Article 4.9 of the Zoning Resolution specifies that outdoor fixtures shall be of full cutoff and shall be placed so as to allow no light above the horizontal as measured at the luminaire, and shall be located, aimed or shielded so as to minimize glare and stray light trespassing across property boundaries and into public right-of-way in accordance with the standards set forth for specific uses. Any exterior lighting that is in compliance with the Zoning Resolution should not negatively impact adjacent properties.

 

(10)     INGRESS AND EGRESS TO THE PROPERTY.

 

The applicant is proposing one curb cut for ingress/egress on Roosevelt Highway (SR14/US 29). Staff notes that the number and location of curb cuts are subject to the approval of the Fulton County Traffic Engineer and the Georgia Department of Transportation. 

 

CONCLUSION

 

In Staff’s opinion, the proposed wrecker/towing facility is consistent with Plan policies and is an appropriate use for the area, if developed with the requirements of the Zoning Resolution and Staff’s Recommended Conditions. Therefore, Staff recommends the zoning petition, the Use Permit and all parts of the concurrent variance be APPROVED CONDITIONAL subject to the attached Recommended Conditions.

 

COMMUNITY ZONING BOARD RECOMMENDATION

 

On October 21, 2008 the Community Zoning Board deferred this petition for up to 90 days per the applicant’s request in order for the applicant to have additional time to resolve access issues off of Houston Street with appropriate agencies.

 

COMMUNITY ZONING BOARD RECOMMENDATION

 

On November 18, 2008 the Community Zoning Board approved this petition, the Use Permit and all parts of the concurrent variance per Staff’s recommendation. There was no opposition to this petition at the public hearing.

 

 

RECOMMENDED CONDITIONS

 

If this petition is approved by the Board of Commissioners, it should be approved M-1 (Light Industrial) CONDITIONAL with a Use Permit for a wrecker/towing facility (Article 19.4.39) subject to the owner’s agreement to the following enumerated conditions. Where these conditions conflict with the stipulations and offerings contained in the Letter of Intent, these conditions shall supersede unless specifically stipulated by the Board of Commissioners.

 

1.         To the owner's agreement to restrict the use of the subject property as follows:

 

a.         Restrict the use of the subject property to a Salvage/Storage and/or Junk Facility at an overall density of 2,201.26 gross square feet per acre zoned or a total gross floor area of 3,500 square feet, whichever is less.

 

b.         Limit the height of the building to no more than one and one-half (1½) stories.

 

2.         To the owner's agreement to abide by the following:

 

a.         To the site plan received by the Department of Environment and Community Development on November 20, 2008. Said site plan is conceptual only and must meet or exceed the requirements of the Zoning Resolution and these conditions prior to the approval of a Land Disturbance Permit. In the event the Recommended Conditions of Zoning cause the approved site plan to be substantially different, the applicant shall be required to complete the concept review procedure prior to application for a Land Disturbance Permit. Unless otherwise noted herein, compliance with all conditions shall be in place prior to the issuance of the first Certificate of Occupancy.

 

3.         To the owner's agreement to the following site development considerations:

 

a.         Allow a new storage facility within 3 miles of an existing facility (2008VC-0028 SFC, Part 1).

 

b.                  Reduce the required 200-foot buffer and 10-foot improvement setback to a 25-foot buffer and no improvement setback along the south property line (2008VC-0028 SFC, Part 2).

 

c.                  Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the east property line (2008VC-0028 SFC, Part 3).

 

d.                  Reduce the required 200-foot buffer and 10-foot improvement setback to a 15-foot buffer and no improvement setback along the north property line (2008VC-0028 SFC, Part 4).

 

e.         The 100 percent opaque fence along Roosevelt Highway (SR 14/US 29) shall be 8 foot in height and constructed of a durable man-made material such as vinyl or other composite material in an earth tone color with no barb-wire or razor-wire extending above the top of the fence.

 

f.          Provide minimum 6-foot tall evergreen plant material at the time of buffer planting along Roosevelt Highway (SR 14/US 29).

 

g.         Reduce all buffers and improvement setbacks to the extent necessary to allow existing structures to remain.

 

4.         To the owner's agreement to abide by the following requirements, dedication and improvements:

 

a.         Dedicate at no cost to Fulton County along the entire property frontage, prior to the approval of a Land Disturbance Permit, sufficient land as necessary to provide the following rights-of-way, and dedicate at no cost to Fulton County such additional right-of-way as may be required to provide at least 10.5 feet of right-of-way from the back of curb of all abutting road improvements, as well as allow the necessary construction easements while the rights-of-way are being improved:

 

55 feet from centerline of Roosevelt Highway (SR 14/US 29) or as may be required by the Georgia Department of Transportation.

 

b.         Access to Roosevelt Highway (SR 14/US 29) shown on the applicant’s site plan dated November 20, 2008 shall be permitted and installed by the owner should the existing access from Houston Street (no right-of-way or easement found) be prohibited.

 

5.         To the owner's agreement to abide by the following:

 

a.         Prior to submitting the application for a (LDP) with the Department of Environment and Community Development, Development Review Division, arrange to meet with the Fulton County Traffic Engineer.  A signed copy of the results of these meetings will be required to be submitted along with the application for a Land Disturbance Permit.

 

b.         Prior to submitting the application for an LDP, arrange an on-site evaluation of existing specimen trees/stands, buffers, and tree protection zones within the property boundaries with the Fulton County Arborist.  A signed copy of the results of these meetings will be required to be submitted along with the application for an LDP.

 


APPENDIX

 

COMMENTS ON PUBLIC SERVICES AND UTILITIES

 

NOTE: Various Fulton County departments or divisions that may or may not be affected by the proposed development provide the following information. Comments herein are based on the applicant’s conceptual site plan and are intended as general non-binding information and in no manner suggest a final finding by the commenter. All projects, if approved, are required to complete the Fulton County Plan Review process prior to the commencement of any construction activity.

 

TRANSPORTATION FACILITIES:

 

Road name: Roosevelt Highway (SR 14/US 29)

Classification: Principal Arterial

Level of Service: C or better

 

Anticipated Traffic Generation Rates:

Average: 9 trips per day

Peak Hour: 1 trip

 

HEALTH DEPARTMENT:

 

This department is requiring that plans indicating the number and location of outside refuse containers along with typical details of the pad and approach area for the refuse containers be submitted for review and approval.

Since this development utilizes an onsite sewage management system, the owner must obtain approval from this Department prior to issuance of a building permit or a use permit and before building construction or renovation.  

 

WATER AND WASTEWATER (SEWER):

 

WATER:

 

Anticipated water demand: 389 gallons per day

 

This project is within the Atlanta jurisdiction.

 

Comments: This information does not guarantee that adequate water volume and pressure are available at this time or will be adequate upon application of permits. Please contact the Department of Public Works for more information.

 

SEWER:

 

Basin: Morning Creek

Treatment Plant: Camp Creek

Anticipated sewer demand: 350 gallons per day

 

The nearest wastewater pipeline to this project is +/- 32 linear feet located in Land Lot 100, District 9F.

 

Comments: This information does not guarantee that adequate sewer capacity is available at this time or will be available upon application of permits. Please contact the Department of Public Works for more information.

 

DRAINAGE:

 

Flood Plain: None.

 

 

 

BOARD OF EDUCATION:

 

No comments.

 

TAX ASSESSOR:

 

Property Tax ID#: 09F-2202-0100-033-7

 

Taxes on the subject property are up-to-date.

 

FIRE MARSHAL:

 

Fire Station: Station 14, Battalion 1.

 

Impact: Should not have adverse effect.

 

POLICE DEPARTMENT ZONING IMPACT STATEMENT:

 

Beat: 27

 

Impact Statement on Beat:

Current calls for service: 11,011

Projected calls for service: Unknown

**** Current average response time: 9 minutes

 

** Increase in the number of residents: 6.86

 

* Increase in E-911 calls  for service (police, fire, E.M.S.): 17.2

 

*** Increase in the number of traffic accidents: 0.4

 

PROJECTED IMPACT ON DEMAND FOR POLICE SERVICES:

 

It is the policy of the Fulton County Police Department to answer all calls for service regardless of the impact of a particular development. However, two of the most noticeable indicators of the quality of police service will be as follows: As demands for service increase, police response time to calls will increase. Time available for proactive neighborhood/business patrol will decrease and crime prevention efforts will decline.

 

The Police Department does anticipate a significant impact on demand for police services.

 

*           Based on 1998 population of 222,794 and 1998 total calls for service of 584,054 (194,242 for police services).

**          Based on average single family residence population of four, average apartment population of two and 1.96 persons per 1,000 gross square feet of space.

***        Based on 1998 accident calls of 8,009.

****       Based on average response time of 10.7 minutes (North Fulton) and 8 minutes (South Fulton).

*****      Based on average of two (2) cars per single family residence.

 

Note: The demand for police service is determined by socio-economic, legislative and other forces which do not lend themselves to predictability. Therefore, projections are made from historical data only. (There has been a 13.96% increase in calls for police service from 1996 to 1997)

 

EMERGENCY SERVICES:

 

If zoning petition is approved there will be an increase in E911 call volume.  The increase may negatively affect the Department’s call answering speed and service level.

 

Increased traffic volume without road improvements may increase response times of emergency response vehicles thereby reducing effective delivery of emergency services.

 

Addressing of all proposed properties identified within the petitions must comply with the County’s Addressing Standard to reduce the likelihood of delay in response time.

 

City of Atlanta, Department of Aviation (DOA)

 

The proposed project is located approximately 6.8 miles southwest of the Hartsfield-Jackson Atlanta International Airport. As such, the proposed site is outside the future 65 DNL noise contours associated with the airport, which are identified on the Federal Aviation Administration approved years 2007 and 2012 noise contour maps. According to the Code of Federal Regulations Title 14, Part 150, this type of development is deemed compatible.

 

Additionally, the site does not lie under protected airspace associated with the Airport; therefore, there are no restrictions as to height of buildings that may be constructed on the proposed site.